My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/27/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 03/27/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:02:16 AM
Creation date
3/22/2007 3:31:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/27/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Proposal <br />CONCM PEENING FOR . PROPOSM PARK AT SUNFISH LAKE <br />Task I — Confirm Understanding /Approach to the Project <br />Consultant to review the project goals with city staff and to finalize the project approach. <br />Topics to be discussed include but are not limited to: <br />• identification of key issues, <br />• explore preliminary concepts for integrating a residential housing component <br />within the general area, <br />• sources of background information, <br />• potential uses and connections, <br />• support materials necessary for meetings with City staff and consultants, <br />• project phasing and ownership issues, as well as project schedule, <br />• identify alternative funding mechanisms for park development, <br />• Public participation <br />NOTE: Some of this Task's issues may actually occur prior to the consultant preparing <br />the proposal as scoping activity. <br />Task 2 - Assemble Base Information - Tour Project Area <br />Consultant to assemble project base maps from available data sources. Existing <br />boundary and topographical surveys and aerial photography will be used to create a <br />CAD /GIS base map for the project area. Additionally, confer with the Anoka County <br />Conservation District on the land cover and natural resources and as well as soils <br />patterns. During the project tour, a photographic inventory is to be completed and project <br />features that are not apparent on the base maps will be added. (The city -wide Natural <br />Resources Inventory being developed concurrently with this project will be utilized as <br />information becomes avalible.) <br />Task 3 — Generate a Park Service Area Analysis <br />Consultant to gather and compile relevant land use and housing information to determine <br />the likely number of near and long term users of the proposed park facilities. Identify <br />`highest and best' land use within service area for planning purposes. Review appropriate <br />public planning documents and existing plats to estimate households that will be within <br />reasonable walking or biking distance from the park. Analyze how other nearby park <br />facilities (existing and proposed) will compliment or place demands within the new park. <br />—155— <br />
The URL can be used to link to this page
Your browser does not support the video tag.