My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 04/09/1998 - Comprehensive Plan Workshop
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
1998
>
Minutes - Council Work Session - 04/09/1998 - Comprehensive Plan Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:54:57 PM
Creation date
6/12/2003 9:44:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Title
Comprehensive Plan Workshop
Document Date
04/09/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o~-o~ooo~o MUIbIN~TON KOEBLER 461 PO? APR 18 '98 12:57 <br /> <br />SUMMARY AND NEXT STEP <br />Brad Scheib summarized what was revealed by the exercise. Most of the groups were in <br />agreement regarding the ideas they liked. The environmental protection idea was the <br />only idea that revealed split preference. The next step in the process is for the consultants <br />to summarize this meeting and condense the ideas into one concept that best represents a <br />shared vision for the future community. The concepts and results from the exercise will <br />be presented to the various boards and commission over the next few months and a rough <br />draft of the plan is anticipated to be available by the end of )'uae at which time a public <br />hearing will be had to review the plan. When the plan is completed it will be seat to <br />adjacent communities for comment and review. Brad indicated that no dates have been <br />established for the furore meetings but participants were encouraged to follow the local <br />newspaper and city newsletter for future meeting dates. <br /> <br />CLOSING COMMENTS <br />A participant inquired as to how existing roadways would be treated under the plan and <br />how the maintenance and improvement of existing roadways would get done while trying <br />to achieve the ideas within the plan. Brad indicated that the plan will establish criteria for <br />roadways including maintenance and that future funding will be set out in the Capital <br />Improvement Program prepared by the City. <br /> <br />Mayor Gamec thanked the participants for coming out and provided a brief update to <br />current activities in town including the Highway 47 project. <br /> <br />Brad indicated that there will be a meeting to focus on the Ivlississippi River Corridor <br />which will result in a plan for the Mississippi National River Recreation Area, and <br />incorporated into the Comprehensive Plan. Brad encouraged everyone to attend this <br />meeting on April 30ih at Ramsey Elementary School. <br /> <br />Brad also indicated that the concepts will be on display at City Hall for viewing since not <br />all participants were able to attend the meeting. The display will only la.st for two weeks. <br /> <br />Following some closing comments by the participants the meeting was adjourned mound <br />9:30 p.m. <br /> <br />Concept Review Session <br /> <br />Page 6 of 6 <br /> <br />Hoisington Koegler Group, lnc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.