My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/17/2007
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2007
>
Agenda - Public Works Committee - 04/17/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:48:23 PM
Creation date
4/13/2007 3:48:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # 10 <br /> <br />PARKING RAMP SAFETY CONCERNS <br />By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />A disposal chute was incorporated into the design of the parking ramp in an effort to <br />assist in the efficient removal of snow. The snow disposal chute is located in the <br />southwest comer of the ramp and has openings on the top of the ramp as well as on <br />the third level. At street level there is an opening facing Civic Center Drive large <br />enough to allow tandem a,'(Ic trucks to enter beneath the chute and be loaded. This <br />truck access is secured by two large doors. <br /> <br />At the March 20, 2007 Committee meeting it was discussed that a safety issue may <br />exist in that the openings could allow an inattentive bicyclist to crash and project <br />over the wall and into the snow chute. Staffhas developed a low cost plan for <br />securing the snow chute openings on both the top and third levels which consists of a <br />bar grate constructed 0[2" steel tubes spaced 4' on center. The grate will be hinged <br />on the top floor and removable on the third level. The grating will be locked in place <br />except during snow removal operations. <br /> <br />The cost of the work will be $700 and staff has taken the initiative of ordering the <br />work so that it can be in place as soon as possible. <br /> <br />Action: <br /> <br />Based upon discussion <br /> <br />PW: 04/17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.