Laserfiche WebLink
about $200 and it is anticipated that modified lighting options will be in place in four to six <br />weeks. <br />The Committee directed that this issue be presented to the whole City Council. <br />Action: <br />Based upon discussion <br />Case #12 Rivers Bend Park Lighting <br />Background: <br />Recently a traditionaire (decorative) street light was placed at the intersection of Waco Street and <br />142" Lane to assist with safety at this intersection. A similar need for lighting is also warranted <br />at the entrance to Rivers Bend Park at the corner of Waco Street and 142nd Avenue. The <br />Committee recommended to installation of a street light at this location using funds from the <br />Priority Street lighting account. <br />Action: <br />Ratify the recommendation of the Public Works Committee. <br />COMMITTEE INPUT <br />Reviewed by: <br />Public Works Director/Principal City Engineer <br />City Engineer <br />CC: 04/24/07 <br />