My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/24/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 04/24/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:19:26 PM
Creation date
4/20/2007 9:41:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/24/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 14, 2007 <br />Re: Informational Meeting regarding Feasibility Study for 157` Lane Sanitary Sewer and <br />Water Extension <br />Dear Property Owner, <br />A petition signed by 15 of the 17 properties along 157 Lane was presented to the City <br />on February 14, 2006. Several feasibility study drafts which describe the scope of the <br />improvements and identify the associated costs have been reviewed by the Public Works <br />Committee and City Council since that time. Enclosed is a copy of the latest draft of this <br />study. I would encourage you to review its contents particularly the sections describing <br />the proposed improvements and the financing. Since many of the residents have <br />expressed interest in subdividing their properties, please note that figure 2 provides a <br />conservative estimate of the potential for creating additional lots. <br />At this time I would like to invite. you to an open house to be held on Thursday March <br />22, 2007 between 7:00 and 8:30 pm in the Alexander Ramsey Room of the Ramsey <br />Municipal Building, 7550 Sunwood Drive. You are welcome to come at any time during <br />this period. There will be a brief presentation of the study at 7:30 pm. The purpose of <br />this meeting will be to answer any questions you might have regarding this study. Unless <br />significant changes are suggested as a result of this meeting the next step would be to <br />conduct a public hearing before the City Council <br />The City Council will make the final determination of the contents of the feasibility study <br />following the public hearing which would then become the governing document for the <br />project. Property owners have control over whether the project proceeds by petitioning <br />for or against the propertywithin sixty days following the close of the public hearing. If <br />the project is not opposed by more than 50% of the property owners the City Council <br />may order the project. The council has indicated that prior to ordering this project there <br />will need to be some assurance of the property owner's willingness to pay for the project. <br />Several options for this are currently being investigated. <br />I look forward to meeting with you to discuss this project further. <br />Sincerely, <br />Steven Jankowski, PE <br />City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.