Laserfiche WebLink
allows the water to flow by gravity toward Trott Brook, a distance of several hundred feet <br />based upon the experience of the Public Works Department through its remedial <br />pumping.. , <br />Recommendation: <br />It is the recommendation of staff that the permanent solution to the drainage problem. <br />experienced by the greenhouse should be to implement the drainage plan proposed in the <br />MFRA report. The impact of runoff from the county highway does not appear to be a <br />significant factor in the ponding problem experienced by the greenhouse. The elevation <br />of the county road is. virtually the same elevation 400 feet to the east and the runoff from <br />the highway is contained in the county ditch at this location which is adjacent to an open <br />field. <br />The Committee may wish to consider to continue to assist the greenhouse in emergency <br />situations as it has in the past and to provide technical advice if needed. <br />Action: <br />Motion to recommend to City Council that staff be directed to respond to the greenhouse <br />by recommending that they implement the MFRA planned drainage improvements. <br />Reviewed By: <br />Director of Public Works/Principal Engineer <br />Civil Engineer H <br />Street Supervisor <br />PW : 04/17/07 <br />66 <br />