My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/08/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 05/08/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:21:06 PM
Creation date
5/4/2007 3:11:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/08/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />• <br />City of Ramsey Municipal Center OR I G INA L <br />CHANGE ORDER <br />City of Ramsey CHANGE ORDER NUMBER: <br />1151 -15 <br />7550 Sunwood Drive DATE: <br />07- Mar -2007 <br />Ramsey, MN CONTRACTOR DATE: <br />01- Jun -2005 <br />CONTRACTOR FOR: <br />RM -1151: Mechanical <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction\Gontracts11151 - Klamm <br />TO CONTRACTOR: Klamm Mechanical Contractors <br />12409 Co. Rd. # 11 <br />Burnsville, MN 55337 <br />The Contract is changed as follows: <br />FCA 169 - Provide fall protection grates in AHU 1 and AHU 2. Add <br />$5,418.75 <br />FCA 171 - Per RFI 290 replace fire dampers with firelsmoke motorized Add <br />$4,151.50 - <br />dampers and remove supply duct from VAV -1 -06 to F129. <br />FCA 195 - Furnish and install condensate piping including transfer pump Add <br />$1,470.28 - <br />from HRU -1 in F253, per RFI 296. <br />FCA 215 - Remove HWP-4 from air handling unit 4. Add <br />$411.18_ <br />TOTAL CHANGES: Add <br />$11,451.71 <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith including any adjustment in the Contract Sum or the Contract Time <br />The Original Contract Amount was $1,806,000.00 <br />Net change by previously authorized Change Orders $48,635.52 <br />The Current Contract Amount prior to this Change Order was $1,854,635.52 <br />The Current Contract Amount will be increased by this Change -Order in the amount of $11,451.71 <br />The new Current Contract Amount including this Change Order will be $1,866,087.23 <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is 30 -Sep -2006 <br />BKV Group, Inc. <br />Minneapolis, MN <br />Date <br />Klamm Mechanical Contractors <br />Burnsville, MN <br />3D /I - Minneapolis <br />Minneapolis, MN <br />/ C�O ( � NSTRUCT10 MANAGER <br />• <br />Date <br />—71 <br />City of Ramsey <br />Ramsey, MN A <br />
The URL can be used to link to this page
Your browser does not support the video tag.