My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/17/2003
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2003
>
Agenda - Council Work Session - 06/17/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:50:46 PM
Creation date
6/20/2003 9:29:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/17/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 <br /> <br />As previously discussed, the proposed Trunk Storm Sewer System will be <br />connected to an existing 42-inch storm sewer system along Sunfish Lake <br />Boulevard. As designed, the District discharges 18cfs to the 42-inch pipe during <br />the 10-year event. <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the construction, easement <br />and overhead costs. Construction costs are estimated contract amounts for the <br />actual construction. Easement costs include providing a 20-foot permanent <br />drainage easement along the entire length of the Trunk Storm Sewer System. It <br />was assumed that temporary construction easements would be provided at no <br />cost. If easements cannot be obtained through negotiation, eminent domain will <br />be required. The cost of condemnation is not included in the cost presented <br />below, and would increase the necessary tax.to finance the project. Overhead <br />costs include, but are not limited to, engineering, construction staking and <br />inspection, administrative service, legal, and contingency. Overhead costs for <br />the project are estimated based on percentages of construction cost. Those <br />percentages are estimated to be as follows: <br /> <br />Engineering 8% <br /> <br />Staking & Inspection 6% <br />Bonding & Legal 1% <br /> <br />City Staff Administration 5% <br />Contingencies 5% <br /> <br />The estimated cost of construction plus overhead and easements are shown <br />below in Table 1. <br /> <br />TABLE 1 <br /> <br />ESTIMATED TOTAL PROJECT COST <br /> <br />· Construction Cost <br />· Construction Overhead Cost (25%) <br /> Estimated Construction Cost <br /> <br />· Easement Cost <br />Total Project Cost <br /> <br />$272,700 <br />$68,20O <br /> <br />$340,900 <br /> <br />$50,200 <br /> <br />$391,100 <br /> <br />In projecting the estimated costs of construction, data from projects constructed <br />in the metropolitan area over the last several years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in <br />current dollars. <br /> <br />Page 3 <br />\\Ha01\Shared Docs\MunicipalWRAMSEY~417~ra417FSR.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.