My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/25/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 03/25/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:46:22 PM
Creation date
6/23/2003 2:17:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br /> <br />cAsE # <br /> <br />AUTHORIZE ADVERTISEMENTS FOR BIDS FOR PHASE II OF <br />IMPROVEMENT PROJECT #99-67 <br />(MISSISSIPPI SUBDRAINAGE DISTRICT NO. 1) <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />In November of 1999 the Mississippi Subdrainage District No. 1 was created to provide <br />drainage improvements for the acre of land located between the railroad tracks and <br />Highway 10, from Sunfish Lake Drive (CR 57) and the eastern city limits. Plans were <br />subsequently prepared for a construction project which would involve two Phases. The <br />first Phase would install storm sewer eastward from and including, the Zitsloffproperty. <br />This portion of the district had existing drainage problems, and needed storm sewer to <br />facilitate the development of the Zitsloffproperty. The western portion of the district <br />was to have storm sewer installed at a later Phase. <br /> <br />Bids for both Phase I and II were received in September of 2000. Phase I was <br />constructed under a contract utilizing these bids during 2001 construction season. At this <br />time it is desired to proceed with Phase II of the construction. <br /> <br />Because of the length of time which has elapsed since bids were originally obtained in <br />September 2000, Staff is recommending that bids for phase II of this project be solicited <br />at this time to avoid any question of compliance with legal bidding requirements. <br /> <br />Action: <br /> <br />Motion to adopt attached resolution soliciting bids for Phase II of Improvement Project <br />#99-67. <br /> <br />Reviewed by: <br />City Administrator <br />Director of Public Works/Fire Chief <br />Principal City Engineer <br /> <br />CC: 03/25/03 <br /> <br />-151- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.