My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/12/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 06/12/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:23:23 PM
Creation date
6/8/2007 11:14:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/12/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # Cf <br /> <br />CONSIDER CHANGE ORDER FOR IP 05-41 WATER SUPPLY WELLS 7 & 8 . <br />By: Leonard Linton, Civil Engineer II <br /> <br />Background: <br /> <br />The Comprehensive Water System Study was completed in 2004 to help the city <br />establish priorities, plan, fund and implement improvements to the Municipal water <br />supply system. The Study identified the need to add wells 7 and 8 to keep pace with the <br />demand as new homes are constructed and added to the system. <br /> <br />Wells 7 is ready for installation of the pump. The driller is performing the test pumping <br />for well 8. The results of the pumping indicate Well 8 is capable of producing at a higher <br />capacity than anticipated due to the rock formation and the skill of the driller. The bids <br />anticipated installing a pump with a capacity of 1000 gallons pet minute(gpm). The test <br />pumping has gone up to 1900 gpm without exceeding the limit for sand or impacting <br />adj acent City Wells. Realizing this capacity, the equivalent of a second well, will require <br />changing the size oftlle electrical wires, control panel and pump for this well. The <br />Contractor has providbd an estimate of $50,000 for this work. The initial contract for this <br />well was $347,000, a~proving this change order will provide a significant increase in <br />capacity for approximately 15% of the cost of a new well. <br /> <br />Funding Source: I . . <br /> <br />i <br />The funding soorce Will be the Water Utility Fond. <br /> <br />Staff Recommendatrn: <br /> <br />Staff recommends approving this change order for Well No.8 in the amount of $50,000 <br />to increase the size o:flthe pump and associated controls. <br /> <br />Council Action: <br /> <br />I <br /> <br />Motion to approve c~ange order for Well No.8. <br /> <br />Reviewed by: <br />Finance Director <br />Interim City Admini~trator <br />Director of Public Works/ Principal City Engineer <br />CC: 5/22/07 <br /> <br />-135- <br />
The URL can be used to link to this page
Your browser does not support the video tag.