Laserfiche WebLink
<br />CASE #g <br /> <br />UPDATE ON STORM WATER IMPROVEMENTS IN FOX RIDGE ESTATES <br />By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />Project 07-03 of the 2007 Street Maintenance Program includes the sea1coating and <br />cracksealing of Fox Ridge Estates. An illustration of this project area is attached to this <br />case. In investigating drainage issues at the' intersections of Potassium Street with <br />Potassium Court and 172nd Lane it has become apparent that storm sewer would be the <br />best solution to resolving the drainage problems that exist along a 1200 foot segment of <br />roadway illustrated in the attached figure. The storm sewer installation will affect half of <br />the 30 foot wide roadway and will not be able to be scheduled until mid to late August. <br /> <br />It would therefore not be advisable to sea1coat this segment of street in July with the <br />remainder of this subdivision. Staff would propose that this segment be eliminated from <br />this year's. program and placed on the 2008 sealcoat schedule. As a result of this <br />elimination four properties proposed for the $252 sealcoat assessment will not receive <br />sealcoating of any of their frontage in 2007 and another 5 properties will receive a partial <br />sealing of their street frontage. The issue to be addressed is how these properties should <br />be treated relative to assessments for the 2007 program. As you know sea1coat <br />assessments are proposed but not assured of being eliminated in 2008. <br /> <br />Recommendation: <br /> <br />Staff recommends that all nine properties affected be retained on the 2007 assessment <br />role for project 07-03 and that a letter be sent to these residents explaining the schedule <br />for storm sewer and sealcoating improvements and the decision on the 2007 sea1coating <br />assessment. <br /> <br />Action: <br /> <br />Motion to recommend to City Council that all nine properties affected be retained on the <br />2007 assessment role for project 07-03 and that a letter be sent to these residents <br />explaining the schedule for storm sewer and sealcoating improvements and the decision <br />on the 2007 sealcoating assessment. <br /> <br />Reviewed By: <br />Director of Public Works/Principal City Engineer <br /> <br />PW: 06/19/07 <br /> <br />9 <br />