Laserfiche WebLink
PAY ESTIMATE NO. 12 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />DIU JCIICUY <br />ITEM <br />NO. <br />M - J.ff <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO- <br />DATE <br />EXTENSION <br />60 <br />F & I Sign Panel Type "D" <br />7 <br />EACH <br />$258.00 <br />EACH <br />$1,806.00 <br />7 <br />$1,806.00 <br />61 <br />TYPE III BARRIDADE <br />I I <br />EACH <br />$309.60 <br />EACH <br />$3,405.60 <br />2 <br />$619.20 <br />62 1PAVEMENT <br />MESSAGE ONLY POLY PREFORMED <br />32 <br />EACH 1 <br />$387.00 <br />EACHI <br />$12,384.00 <br />$0.00 <br />63 <br />PAVEMENT MESSAGE RR CROSSING PAINT <br />2 <br />EACH <br />$159.96 <br />EACH <br />$319.92 <br />1 <br />$159.96 <br />64 <br />PAVEMENT MESSAGE COMBINATION ARROW PAINT <br />4 <br />EACH <br />$82.56 <br />EACH <br />$330.24 <br />2 <br />$165.12 <br />65 <br />PAVEMENT MESSAGE RIGHT ARROW POLY PREFORMED <br />12 <br />EACH <br />$309.60 <br />EACH <br />$3,715.20 <br />9 <br />$2,786.40 <br />66 <br />PAVEMENT MESSAGE LEFT ARROW POLY PREFORMED <br />28 <br />EACH <br />$309.60 <br />EACH <br />$8,668.80 <br />16 <br />$4,953.60 <br />67 <br />4" BROKEN LINE YELLOW EPDXY <br />200 <br />LF <br />$0.51 <br />LF <br />$102.00 <br />5064 <br />$2,582.64 <br />68 <br />4" SOLID LINE WHITE - EPDXY <br />12500 <br />LF <br />$0.50 <br />LF <br />$6,250.00 <br />10208 <br />$5,104.00 <br />69 <br />4" BROKEN LINE WHITE - EPDXY <br />3150 <br />LF <br />$0.50 <br />LF <br />$1,575.00 <br />1425 <br />$712.50 <br />70 <br />24" STOP LINE WHITE - EPDXY <br />800 <br />LF <br />$712 <br />IF <br />$5,776.00 <br />$0.00 <br />71 <br />36" SOLID LINE WHITE - EPDXY <br />1100 <br />LF <br />$8.67 <br />LF <br />$9,537.00 <br />$0.00 <br />72 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />7350 <br />LF <br />$1.01 <br />LF <br />$7 <br />6252 <br />$6,314.52 <br />73 <br />24" SOLID LINE YELLOW - EPDXY <br />1670 <br />LF <br />$5.68 <br />LF <br />$9,485.60 <br />496 <br />$2,817.28 <br />74 <br />4" SOLID LINE WHITE - PAINT <br />3000 <br />LF <br />$0.41 <br />LF <br />$1,230.00 <br />725 <br />$297.25 <br />75 <br />4" DOUBLE SOLID LINE YELLOW - PAINT <br />2300 <br />LF <br />$0.83 <br />LF <br />$1,909.00 <br />$0.00 <br />76 <br />24" SOLID LINE YELLOW - PAINT <br />330 <br />LF <br />$2.58 <br />LF <br />$851.40 <br />0 <br />$0.00 <br />77 <br />NMC LOOP DETECTOR 6'X 6' <br />43 <br />EACH <br />$485.04 <br />EACH <br />$20,856.72 <br />42 <br />$20,371.68 <br />78 <br />PVC HANDHOLE METAL FRAME AND COVER <br />23 <br />EACH <br />$567.60 <br />EACH <br />$13,054.80 <br />21 <br />$11,919.60 <br />79 <br />INSTALL 4 " -6" PVC (SCH 40 CONDUIT <br />2400 <br />LF <br />$6.45 <br />LF <br />$15,480.00 <br />6244 <br />$40,273.80 <br />80 <br />F & 14" RIGID STEEL CONDUIT <br />430 <br />LF <br />$25.18 <br />LF <br />$10,827.40 <br />430 <br />$10,827.40 <br />81 <br />BALE CHECK <br />200 <br />EACH <br />$11.87 <br />EACH <br />$2,374.00 <br />$0.00 <br />82 <br />SILT FENCE TYPEMACHINE SLICED <br />1000 <br />LF <br />$1.81 <br />LF <br />$1,810.00 <br />880 <br />$1,592.80 <br />83 <br />TEMPORARY CONSTRUCTION ROCK ENTRANCE <br />2 <br />EACH <br />$2,412.51 <br />EACHI <br />$4,825.02 <br />2 <br />$4,825.02 <br />84 <br />I SEEDING <br />3.0 <br />ACRE <br />$258.00 <br />ACRE <br />$774.00 <br />2.7 <br />$696.60 <br />85 <br />SODDING, TYPE LAWN <br />5000 <br />SY <br />$2.48 <br />SY <br />$12,400.00 <br />1893 <br />$4,694.64 <br />86 <br />SEED MIXTURE 260 <br />300 <br />LB <br />$2.63 <br />LB <br />$789.00 <br />270 <br />$710.10 <br />87 <br />MULCH MATERIAL TYPE 3 <br />6 <br />TON <br />$154.80 <br />TON <br />$928.80 <br />5.4 <br />$835.92 <br />88 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />100 <br />SY <br />$1.55 <br />SY <br />$155.00 <br />$0.00 <br />89 <br />COMMERCIAL FERTILIZER ANALYSIS 24 -2 -24 <br />1200 <br />LBS <br />$0.36 <br />LBS <br />$432.00 <br />1080 <br />$388.80 <br />Total Bid Schedule "A" $1,951,654.92 51,788,673.40 <br />G: /SharedDocs/MunicipaVARamsey/ PE-3 3171/ra3171pePAY ESTIMATE NO. 12 <br />�77- <br />