My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 06/26/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:24:08 PM
Creation date
6/22/2007 11:51:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 12 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br />Rid Schedule "B" - Ram- 1-1 Fundino Run-nd Ilri- NW Vnnfinu"d <br />ITEM <br />NO. <br />ITEM <br />QTY <br />UNIT <br />UNIT COST <br />CONTRACT <br />AMOUNT <br />USED TO- <br />DATE <br />EXTENSION <br />155 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />34 <br />LF <br />$144:02 <br />LF <br />$4,896.68 <br />34 <br />$4,896.68 <br />156 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020 <br />6 <br />LF <br />$186.50 <br />LF <br />$1,119.00 <br />6 <br />$1,119.00 <br />157 <br />CASTING ASSEMBLIES B -17 <br />15 <br />EACH <br />1 $564.45 <br />EACHI <br />$8,466.75 <br />16 <br />$9,031.20 <br />158 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN N-4003 <br />5 <br />EACH <br />$318.59 <br />EACH <br />$1,592.95 <br />$0.00 <br />159 <br />CONSTRUCT SANITARY MANHOLE - 48 0 -8' <br />15 <br />EACH <br />$2,056.12 <br />EACH <br />$30,841.80 <br />12 <br />$24,673.44 <br />160 <br />CONSTRUCT SANITARY MANHOLE - 54 0 -8' <br />5 <br />EACH <br />$2,618.03 <br />EACH <br />$13,090.15 <br />0 <br />$0.00 <br />161 <br />CONSTRUCT SANITARY MANHOLE - 60 0 -8' <br />4 <br />EACH <br />$2,745.83 <br />EACH <br />$10,983.32 <br />21 <br />$57,662.43 <br />162 <br />EXTRA DEPTH MANHOLE OVER 8" 48 <br />100 <br />LF <br />$85.20 <br />LF <br />$8,520.00 <br />65.1 <br />$5,546.52 <br />163 <br />EXTRA DEPTH MANHOLE OVER 8" 54 <br />30 <br />LF <br />$133.13 <br />LF <br />$3,993.90 <br />20 <br />$2,662.60 <br />164 <br />EXTRA DEPTH MANHOLE OVER 8" 60 <br />22 <br />LF <br />$149.10 <br />LF <br />$3,280.20 <br />61.9 <br />$9,229.29 <br />165 <br />4" CONCRETE WALK <br />5600 <br />S F <br />$2.01 <br />SF <br />$11,256.00 <br />5040 <br />$10,130.40 <br />166 <br />CONCRETE CURB AND GUTTER DESIGN B424 <br />5475 <br />LF <br />$8.94 <br />LF <br />$48,946.50 <br />5367 <br />$47,980.98 <br />167 <br />SIGN PANELS TYPE C <br />37.5 <br />SF <br />$22.19 <br />SF <br />$832.13 <br />37.5 <br />$832.13 <br />168 <br />TYPE III BARRIDADE <br />8 <br />EACH <br />$309.60 <br />EACH <br />$2,476.80 <br />$0.00 <br />169 <br />PAVEMENT MESSAGE RIGHT ARROW POLY PREFORMED <br />3 <br />EACH <br />$309.60 <br />EACH <br />$928.80 <br />3 <br />$928.80 <br />170 <br />PAVEMENT MESSAGE LEFT ARROW POLY PREFORMED <br />3 <br />EACH <br />$309.60 <br />EACH <br />$928.80 <br />3 <br />$928.80 <br />171 <br />PAVEMENT MESSAGE ONLY POLY PREFORMED <br />2 <br />EACH <br />$387.00 <br />EACH <br />$774.00 <br />$0.00 <br />172 <br />4" SOLID LINE WHITE - EPDXY <br />6500 <br />LF <br />$0.50 <br />LF <br />$3,250.00 <br />6417 <br />$3,208.50 <br />173 <br />4" BROKEN LINE WHITE - EPDXY <br />150 <br />LF <br />$0.50 <br />LF <br />$75.00 <br />150 <br />$75.00 <br />174 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />1350 <br />LF <br />$1.01 <br />LF <br />$1,363.50 <br />2159 <br />$2,180.59 <br />175 <br />24" SOLID LINE YELLOW - EPDXY <br />500 <br />LF <br />$5.68 <br />LF <br />$2,840.00 <br />$0.00 <br />176 <br />SEEDING <br />LO <br />ACRE <br />$258.00 <br />ACRE <br />$258.00 <br />1 <br />$258.00 <br />177 <br />SODDING, TYPE LAWN <br />1250 <br />SY <br />$2.48 <br />SY <br />$3,100.00 <br />1250 <br />$3,100.00 <br />178 <br />SEED MIXTURE 260 <br />100 <br />LB <br />$2.63 <br />LB <br />$263.00 <br />100 1 <br />$263.00 <br />179 <br />MULCH MATERIAL TYPE 3 <br />2 <br />TON <br />$154.80 <br />TON <br />$309.60 <br />2 <br />$309.60 <br />180 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />200 <br />SY <br />$1.55 <br />SY <br />$310.00 <br />$0.00 <br />181 ICOMMERCIAL <br />FERTILIZER ANALYSIS 24 -2 -24 <br />400 <br />LBS <br />$0.36 <br />LBS <br />$144.00 <br />400 <br />$144.00 <br />Total Bid Schedule "B" <br />$1,631,033.54 51,620,933.59 <br />G: /SharedDocs /Municipal /ARamsey/ <br />3171 /re317lpePAY ESTIMATE NO. 12 PE -6 <br />_80_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.