Laserfiche WebLink
<br />CHANGE NAME OF WATER RESOURCES MANAGEMENT PLAN TO <br />COMPREHENSIVE STORM WATER PLAN <br />Staff Input <br /> <br />At the present time the City has two significant planning efforts in progress. The Water <br />Resources Management Plan is being conducted by the engineering firm of Bolton & <br />Menk Inc. and is intended to provide a comprehensive model of our existing s.torm sewer <br />system and the future needs of that system as.development occurs. However it also <br />,contains a significant element which involves the classification of the remaining wetlands <br />which were not ground-truthed under the previous work conducted by Westwood <br />Professional Services in 2006. In addition the City is currently preparing a Natural <br />Resource Inventory which is being conducted by Boonestro & Associates. The field work <br />elements associated with these studies have been confused, and the word "resources" in <br />each of them also tends to make them less distinguishable from one another. <br /> <br />Staff proposes to hereafter refer to the Water Resources Management Plan simply as the <br />Comprehensive Storm Water Plan as this title is more descriptive of the purpose of the <br />plan. <br /> <br />Action: <br /> <br />None required. <br /> <br />9 <br />