Laserfiche WebLink
<br />Wayne Lemaniak <br />Page 2 <br />June 29. 2007 <br /> <br />2. Construction of northbound and southbound left and right turn lanes on CR 57 to <br />provide. adequate refuge areas for turning movements and traffic queues at the <br />intersection; <br />3. Construction of raised median or painted channelization on CR 57 to provide <br />adequate vehicular separation in approach of and exiting the intersection; <br />4. If City/local funding allows, left and right turn lane construction on Alpine Drive <br />would be incorporated into the project. <br /> <br />Utilizing the MnDOT 2002-2005 crash diagrams and including the 6/17/2005 fatal crash, <br />the proposed improvement qualifies for inclusion in the Highway Safety Improvement <br />Program by having benefit /cost ratio of 6.40. The projected Annual Crash Reduction is <br />slightly below the 2.0 criteria at 1.85 crashes annually. <br /> <br />A location map, collision diagrams, the HSIP worksheet, and a concept plan for the <br />proposed project are attached. The estimated project cost is $1,000,000.00. Local funds <br />would be utilized for the required local match. <br /> <br />Thank you for your consideration of this project. If you have any questions regarding the <br />content of this submittal, please contact Jane Rose, Traffic Engineering Manager at <br />763.862.4231. We look forward to the opportunity to deliver this Highway Safety <br />Improvement project. <br /> <br /> <br />Lynd o' t, P.E. <br />Deputy County Engineer <br /> <br />xc: Josie Scott (File - CR 57/Traffic Safety/Spot Studies) <br />File (subject file - 2007 HSIP Submittals) <br />Jane Rose, Traffic Engineering Manager <br />City of Ramsey <br /> <br />13 <br />