My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/24/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 07/24/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:28:17 PM
Creation date
7/20/2007 12:50:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/24/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, $"' <br /> <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br /> <br />ORIGINAL <br /> <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN <br /> <br />CHANGE ORDER NUMBER: 1161-13 <br />DATE: 14-May-2007 <br />CONTRACTOR DATE: 01-Jun-2005 <br />CONTRACTOR FOR: RM-1161: Electrical <br /> <br />PROJECT NUMBER: <br />PROJECT NAME: <br /> <br />060229 <br />Municipal Center\Construction\Contracts\ 1161 - Elect Res <br /> <br />TO CONTRACTOR: <br /> <br />Electric Resource Contractors <br />4024 Washington Avenue North <br />Minneapolis, MN 55412 <br /> <br />The Contract is changed as follows: <br /> <br />FCA 225 - Provide power to the 2 motorized shades in the training room <br />F160 <br />FCA 227 - Provide an emergency shutdown switch outside boiler room <br />door <br />PR 101 - Addition of intercom system in cell area. <br />PR 86 - Remove 13 012 fixtures on the south side of the concourse. <br />PR 95 - Add exterior police globe light fixture (RFI 300) <br />TOTAL CHANGES: <br /> <br />Add $772.00 <br />Add $1,053.00, <br />Add $3,732.00 <br />Credit $1,302.00 <br />Add $1,737.00 <br />Add $5,992.00 <br /> <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br /> <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />$1,239,000.00 <br />$157,895.41 <br />$1,396,895.41 <br />$5,992.00 <br />$1,402,887.41 <br /> <br />30-Sep-2006 <br /> <br />BKV Group, Inc. <br />Minneapolis, MN <br />ARCHITECT <br /> <br />B~ <br />-z.,4MA't07' <br />Date <br /> <br />Electric Resource Contractors <br />Minneapolis, MN <br />CONT CTO <br /> <br /> <br />Datt \ <br /> <br /> <br />-114- <br />
The URL can be used to link to this page
Your browser does not support the video tag.