My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/24/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 07/24/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:28:17 PM
Creation date
7/20/2007 12:50:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/24/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Ramsey Municipal qenter <br />CHANGE ORDER <br /> <br />o DJ r-./ <br />I \ IJ tv A / <br /> <br />- <br /> <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN <br /> <br />CHANGE ORDER NUMBER: 1091-10 <br />DATE: 28-Feb-2007 <br />CONTRACTOR DATE: 25-May-2005 <br />CONTRACTOR FOR: RM-1 091: Drywall <br /> <br />PROJECT NUMBER: <br />PROJECT NAME: <br /> <br />060229 <br />Municipal Center\Construction\Contracts\ 1091 - H&S Drywall <br /> <br />TO CONTRACTOR: <br /> <br />H & S Drywall <br />15753 US HWY 125W <br />Cokato, MN 55321 <br /> <br />The Contract is changed as follows: <br /> <br />Backcharge for roof damages per proposal dated November 21'''2006. <br />Backcharge for work completed by Kenko Drywall. '. <br />Backcharge for work performed by Wasche at corner beads of offi' <br />windows. <br />Detail 11A194, 5/8" gypsum board over 3-5/8" studs not installed. <br />FCA 124 - At 2nd floor lobby, high curved ceiling, provide framing as <br />discussed with John Love with SKV on site. Frame recess to wall located <br />on grid 4/CD. <br />, FCA 127 - Move window frames along concourse, perRFI 267 response, <br />to enable drywall to be tucked into frame on office side of wall. <br />FCA 149- At concourse F122-F123, fill and tape drywall gap around steel <br />beams supporting walkway, per direction of Construction Manager. <br />FCA 157 - Provide pipe chase near door F121A in room F121. <br />FCA 16 - Remove and reinstall doorframes and stud walls in 2 areas <br />where slab is too high. <br />FCA 175 - Sackcharge for contract work not completed. Work completed <br />by Wasche Commercial Finishes <br />FCA 184 - Sackcharge to H&S - frame bowed <br />FCA 187 - Sackcharge from George Cook Construction, cut down wood <br />doors at reception due to area not installed per plan. <br />FCA 70 - Install cement board and plaster at exposed steel columns in <br />detnetion area. <br /> <br /> <br />Credit $308.34 ,/ <br />Credit $913.99 ,,-.- <br />Credit $625.60 ,/ <br />Credit $960.00"-'- <br />Add $225.00""'- <br />Add $2,372.50/ <br />Add $535.00 ./' <br />Add $325.00 <br />Add $325.00 <br />Credit $2,639.98/ <br />Credit $378.00....- <br />Credit $1,143.00- <br />Add $520.00/ <br />~" c;,6~ ---, <br />\ <br /> <br />TOTAL CHANGES: <br /> <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br /> <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />$685,200.00 <br />$41,414.63 <br />$726,614.63 <br />$(2,666.41 ) <br />$723,948.22 <br /> <br />30-Sep-2006 <br /> <br />-117- <br />
The URL can be used to link to this page
Your browser does not support the video tag.