Laserfiche WebLink
Case #1: Request to Vacate a Portion of Willemite Street <br />City Engineer Jankowski stated on June 4, 2007 staff received a letter dated May 30, 2007 from <br />Mrs. Linda Stenquist property owner at 15240 Willemite Street petitioning the City for the <br />vacation of a cul -de -sac which was platted in 1972 as apart of the Greenland Hills subdivision <br />but was never constructed. This street does not require a cul -de -sac since Willemite Street <br />intersects with 152 Lane. <br />Councilmember Dehen arrived at 5:35 p.m. <br />City Engineer Jankowski stated staff would have no objection to the vacation of a portion of the <br />cul -de -sac. However, it will be necessary to retain at least a 66 foot right -of -way through the <br />Willemite/152 Lane corner alignment. In addition, the current Capital Improvement Plan (CIP) <br />anticipates the realignment of Variolite/IJranimite Street as a collector street into the Town <br />Center. Included in the Committee's packet is an excerpt from the CIP showing this anticipated <br />collector street. Since no detailed design work for this alignment has been prepared at this time, <br />staff would point out that it may be advisable to retain the easternmost 40 feet of this dedicated <br />right -of -way in the event that the centerline of the final alignment would shift to the section line. <br />Mr. Jankowski stated Ms. Stenquist was sent notice that this would be discussed this evening. <br />He advised staff recommends the cross hatched portion of the Willemite Street cul -de -sac as <br />identified on the figure entitled "Cul -de -Sac Petitioned for Vacation" be recommended by the <br />Committee to the City Council for vacation and that staff be directed ' to initiate vacation <br />procedures for this portion of right -of -way <br />Chairperson Elvig requested clarification that the City may want to hold onto the easternmost 40 <br />feet of right -of -way. <br />City Engineer Jankowski replied yes, at least until the alignment for the street connection is <br />nailed down. <br />Chairperson Elvig asked if the property owner is considering doing any building. <br />City Engineer Jankowski replied Ms. Stenquist has said they are looking at putting in some sort <br />of workshop. He does not know the exact location. He can contact.her after the meeting and <br />arrange to meet and show what is planned to see if it works for them. <br />Public Works Director Olson stated even keeping the 40 feet is a stretch. Staff discussed the <br />possibility of connection options and/or buying properties west of the alignment, knowing there <br />will be concerned residents when the City pushes a larger volume road through and eliminates <br />accesses. However, they are not quite there yet, and he thinks this would be a safe thing to <br />vacate the portion that has been shown until a point in time that this alignment gets finalized. <br />Motion by Councihmember Olson, seconded by Chairperson Dehen, to recommend to City <br />Council that the cross hatched portion of the Willemite Street cul -de -sac as identified on the <br />figure entitled "Cul -de -Sac Petitioned for Vacation" be recommended for vacation, and that staff <br />be directed to initiate vacation procedures for this portion of right of way. <br />Public Works Committee / June 19, 2007 <br />—256— Page 2 of 12 <br />