My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/14/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 08/14/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:31:18 PM
Creation date
8/10/2007 9:47:49 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/14/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE #4 OWNER <br />CITY OF RAMSEY <br />Bituminous Overlays, Storm Sewer Improvement <br />St. Francis Boulevard <br />Frontage Road Improvements <br />July 18, 2007 <br />Honorable Mayor & City Council <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 -6197 <br />RE: Bituminous Overlays (Projects 06.04, 05, 06, 07 08, 09 and 11), Storm Sewer Improvement (Project 06 -21), St. Francis Blvd. Frontage Road (Project 05 -24) <br />Contractor: Knife River Corporation (Bauerly Co.) <br />Contract Amount: $1,187,788.04' <br />Award Date: September 15, 2006 & July 26, 2006 <br />Completion Date: October 20, 2006 <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above - referenced project by Knife River Corporation (Bauerly Co.) <br />DIVISION B: BITUMINOUS OVERLAY AND STORM SEWER IMPROVMENTS <br />DIU .l, u"U.- <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />- <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />Aggregate Class 2 Shoulder <br />610 <br />CY <br />$25.93 <br />$ 15 817.30 <br />610 <br />$ 15 817.30 <br />2 <br />Mill Bituminous Surface <br />480• <br />SY <br />$5.73 <br />$ 2,750.40 <br />360 <br />$ 2,062.80 <br />3 <br />Type LV4 Wearing Course Mixture <br />14.000* <br />TON <br />$47.23 <br />$ 661 220.00 <br />13,928 <br />$ 657 <br />4 <br />Bituminous Material for Tack Coat <br />3,200r' <br />GAL <br />$1.131 <br />$ 3,616.00 <br />7,9001 <br />$ 8 927.00 <br />5 <br />Traffic Control <br />1 <br />LS <br />$11 <br />$ 11 044.50 <br />1.0 <br />$ 11 044.50 <br />Total Bid Schedule "A" $ 684,44a.20 a ona,oi <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />Remove Bituminous Curb <br />4700 <br />LF <br />$2.86 <br />$ 13 442.00 <br />4,700 <br />$ 13 442.00 <br />2 <br />Remove Concrete Curb and Gutter <br />60 <br />LF <br />$3.15 <br />$ 189.00 <br />41 <br />$ 129.15 <br />3 <br />Remove Concrete Pavement <br />150 <br />SY <br />$5.25 <br />$ 787.50 <br />151.3 <br />$ 794.33 <br />4 <br />Remove Bituminous Pavement <br />9800 <br />SY 1 <br />$2.69 <br />$ 26 362.00 <br />9.869 <br />$ 26 547.61 <br />5 <br />Sawing Bituminous Pavement Full Depth) <br />3500 <br />LF <br />$1.31 <br />$ 4,585.00 <br />3,457 <br />$ 4 <br />6 <br />Sawing Concrete Pavement Full Depth) <br />80 <br />LF <br />$4.73 <br />$ 378.40 <br />80 <br />$ 378.40 <br />7 <br />Topsoil Borrow L <br />500 <br />CY <br />$28.13 <br />$ 14 065.00 <br />2161 <br />6,076.08 <br />8 <br />Aggregate Base Class 5 Modred <br />2200 <br />TON <br />$12.64 <br />$ 27 808.00 <br />2 200 <br />$ 27,808.00 <br />9 <br />Concrete Pavement <br />150 <br />SY <br />$47.25 <br />$ 7.087.50 <br />74 <br />$ 3,496.50 <br />10 <br />Type LV4 Wearing Course Mixture <br />230 <br />TON <br />$61.23 <br />$ 14 082.90 <br />384 <br />$ 23,512.32 <br />11 <br />Type LV3 Non-We.rinq Course Mixture <br />1120 <br />TON <br />$49.12 <br />$ 55 014.40 <br />1,120.0 <br />$ 55 0 <br />12 <br />Bituminous Material for Tack Coat <br />20 <br />GAL <br />$1.48 <br />$ 29.60 <br />20 <br />$ 29.60 <br />13 <br />12" RC Pip. Sewer Design 3006 CL5 <br />270 <br />LF <br />$25.33 <br />$ 6 <br />261 <br />$ 6,611.13 <br />14 <br />15" RC Pip. Sewer Design 3006 CL5 <br />620 <br />LF <br />$27.04 <br />$ 16 764.80 <br />637 <br />$ 17,224.48 <br />15 <br />18" RC Pipe Sewer Design 3006 CL3 <br />1180 <br />LF <br />$29.52 <br />$ 34 833.60 <br />1,171 <br />$ 34,567.92 <br />16 <br />21" RC Pipe Sewer Design 3006, CL3 <br />2450 <br />LF <br />$32.27 <br />$ 79 061.50 <br />2,437 <br />$ 78 641.99 <br />17 <br />2T' RC Pipe Sewer Design 3006, CL3 <br />20 <br />LF <br />$41.79 <br />$ 835.80 <br />172 <br />$ 7 <br />18 <br />12" RC Apron /FES <br />2 <br />EACH <br />$710.85 <br />$ 1,421.70 <br />2 <br />$ 1,421.70 <br />19 <br />15" RC Apron /FES W/Trash Guard <br />2 <br />EACH <br />$860.171 <br />$ 1,720.34 <br />3 <br />$ 2,580.51 <br />20 <br />21" RC Apron /FeS Wlrrash Guard <br />1 <br />EACH <br />$938.091 <br />$ 938.09 <br />1 <br />$ 938.09 <br />21 <br />27" RC Apron /FES W[Trash Guard <br />1 <br />EACH <br />$1.845.311 <br />$ 1,845.31 <br />1 1 <br />$ 1 845.31 <br />Per Change Order No. 1 <br />S:1 MunicipalbAramsey131791ra3179PE PE - 1 <br />-71- <br />
The URL can be used to link to this page
Your browser does not support the video tag.