My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 08/28/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:31:36 PM
Creation date
8/24/2007 12:11:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE# fa <br /> <br />CONSIDER AWARD BIDS FOR IMPROVEMENT PROJECT 07-32 <br />FOX RIDGE STORM SEWER IMPROVEMENTS <br />By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />This project entails the installation of 1300 feet of reinforced concrete storm sewer along <br />Potassium Street between 172nd Lane and Potassium Court which will correct the <br />standing water at these two intersections which has resulted in pavement failure. Bids for <br />this project were opened on Tuesday, August 21, 2007 and sixteen bids were received <br />which are summarized below: <br /> <br />Bidder <br />Doboszenski and Sons Inc. <br />Dryden Excavating, Inc. <br />Hydrocon, Inc. <br />Dave Perkins Contracting, Inc. <br />Imperial Developers <br />New Look Contracting, Inc. <br />Metro Utilities Inc. <br />Northwest Asphalt, Inc. <br />G.L. Contracting, Inc. <br />Kober Excavating, Inc. <br />Dirt Pro <br />Hennen Construction Co. <br />Northdale Construction <br />Jay Bros., Inc. <br />WB Miller, Inc. <br />Three Rivers Construction <br />Engineer's Estimate <br /> <br />Cost <br />$ 78,383.50 <br />$ 80,810.85 <br />$ 84,925.00 <br />$ 89,055.00 <br />$ 89,501.25 <br />$ 91,525.00 <br />$ 91,605.00 <br />$ 91,746.15 <br />$ 93,234.70 <br />$ 94,650.00 <br />$ 98,212.00 <br />$ 98,420.00 <br />$101,152.72 <br />$105,585.00 <br />$114,174.50 <br />$140,545.00 <br />$ 98,000.00 <br /> <br />The low bid received is in the amount of$78,383.50 from Doboszenski and Sons Inc. <br />which is 20% lower than the engineer's estimate of $98,000. This may attributed to the <br />very competitive market at the current time as attested to by the large number of bids <br />received. Although this contractor has not performed work for the Ramsey in the past, he <br />has perfom1ed similar work successfully for the City of Rogers. <br /> <br />Financial Considerations: <br /> <br />Financing for this project will come from the Storm Water Utility. <br /> <br />Recommendation: <br /> <br />Staff recommends the contract for Improvement Project 07-32, Fox Ridge Storm Sewer <br />Improvements be awarded to Doboszenski and Sons Inc., the lowest responsible bidder, <br />in the amount of $78,383.50. <br /> <br />-239- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.