Laserfiche WebLink
<br />Bid Schedule "A". (Contlnued\ <br />ITEM ESTIMATED CONTRACT UNIT USED TO <br />NO. ITEM DESCRIPTION QUANTITY UNIT PRICE CONTRACT AMOUNT DATE EXTENSION <br />28 HYDRANT 2 EACH $2 250.00 $ 4 500.00 2 $ 4 500.00 <br />29 6" GATE VALVE AND BOX 2 EACH $850.00 $ 1 700.00 2 $ 1 700.00 <br />30 8" GATE VALVE AND BOX 2 EACH $1 150.00 $ 2 300.00 3 $ 3 450.00 <br />31 ADJUST GATE VALVE AND BOX 7 EACH $150.00 $ 1 050.00 $ - <br />32 HYDRANT EXTENSION 1 IF $325.00 $ 325.00 $ - <br />33 6" DIP CLASS 53 16 IF $20.00 $ 320.00 16 $ 320.00 <br />34 12" DIP CLASS 52 1000 IF $33.00 $ 33 000.00 960 $ 31 680.00 <br />35 8" DIP CLASS 52 80 IF $24.00 $ 1 920.00 120 $ 2 880.00 <br />36 6" POLYSTYRENE INSULATION 20 SY $32.00 $ 640.00 10 $ 320.00 <br />37 DUCTilE IRON FITTINGS 1050 lB $1.75 $ 1 837.50 700 $ 1 225.00 <br />38 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 6 IF $210.00 $ 1 260.00 6 $ 1 260.00 <br />39 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 . 4020 6 IF $375.00 $ 2 250.00 6 $ 2250.00 <br /> 48" DIA. SAN. MH (0' - 8' DEPTH) INCL. FRAME AND <br />40 CASTING 1 EACH $1 650.00 $ 1 650.00 1 $ 1 650.00 <br />41 CASTING ASSEMBLIES SPECIAL 6 EACH $420.00 $ 2 520.00 $ - <br />42 CASTING ASSEMBLIES (A-7D\ 1 EACH $280.00 $ 280.00 $ - <br />43 CONNECT TO EX. SAN. MH (CORE DRlll\ 1 EACH $650.00 $ 650.00 1 $ 650.00 <br /> CONSTRUCT MH OVER 12" SAN (0' . 8' DEPTH) INCL. <br />44 FRAME AND CASTING 1 EACH $2000.00 $ 2 000.00 1 $ 2 000.00 <br />45 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 3 EACH $850.00 $ 2 550.00 3 $ 2 550.00 <br />46 ADJUST FRAME AND RING CASTING 16 EACH $250.00 $ 4000.00 $ . <br />47 EXTRA DEPTH 48" 0 MH (>8'\ 4.2 IF $100.00 $ 420.00 4 $ 400.00 <br />48 CONCRETE CURB AND GUTTER DESIGN B618 3505 IF $8.75 $ 30668.75 $ - <br />49 CONCRETE TRIANGULAR VAllEY GUTTER SECTIONS 10 EACH $300.00 $ 3 000.00 $ . <br />50 CONCRETE VAllEY GUTTER 105 LF $15.00 $ 1 575.00 $ - <br />51 TRAFFIC CONTROL 1 lS $1000.00 $ 1 000.00 $ . <br />52 TYPE III BARRICADE 5 EACH $400.00 $ 2 000.00 $ - <br />53 SIGN PANELS TYPE C 12.5 SF $40.00 $ 500.00 $ . <br />54 PAVEMENT MESSAGE (COMBINATION ARROWlPAINT 1 EACH $100.00 $ 100.00 $ . <br />55 PAVEMENT MESSAGE (RIGHT ARROWl EPOXY 1 EACH $100.00 $ 100.00 $ - <br />56 PAVEMENT MESSAGE (lEFT ARROWl EPOXY 1 EACH $100.00 $ 100.00 $ - <br />57 PAVEMENT MESSAGE (ONlY\ EPOXY 3 EACH $175.00 $ 525.00 $ - <br />58 F & I SIGN PANEL TYPE "0" 1 EACH $400.00 $ 400.00 $ - <br />59 4" BROKEN liNE YELLOW EPOXY 1495 LF $0.12 $ 179.40 $ - <br />60 4" SOLID LINE WHITE. EPOXY 2470 LF $0.42 $ 1 037.40 $ - <br />61 24" STOP LINE WHITE - EPOXY 64 IF $8.00 $ 512.00 $ - <br />62 36" SOLID liNE WHITE - EPOXY 102 LF $8.00 $ 816.00 $ . <br />63 4" DOUBLE SOLID LINE YELLOW - EPOXY 190 LF $1.00 $ 190.00 $ - <br />64 24" SOLID LINE YELLOW - PAINT 20 LF $6.00 $ 120.00 $ - <br />65 SILT FENCE TYPEMACHINE SLICED 3970 LF $1.90 $ 7 543.00 $ . <br />66 TEMPORARY CONSTRUCTION ROCK ENTRANCE 2 EACH $250.00 $ 500.00 $ . <br />67 SEEDING 1.8 ACRE $250.00 $ 450.00 $ - <br />68 SEED MIXTURE 260 180 LB $2.50 $ 450.00 $ . <br />69 MULCH MATERIAL TYPE 3 3 TON $175.00 $ 525.00 $ - <br />70 EROSION CONTROL BLANKETS CATEGORY 3 40 SY $6.00 $ 240.00 $ - <br />71 COMMERCIAL FERTILIZER ANALYSIS 24-0-24 720 LB $0.70 $ 504.00 $ - <br /> <br />PAY ESTIMATE #1 <br />City of Ramsey <br />Ramsey Town Center <br />Phase 2, Segment 2, Utility and Street Improvements <br /> <br />Total Bid Schedule "A" <br /> <br />$ <br /> <br />323,518.55 <br /> <br />Total Work Completed to Date <br />LESS 5% RETAINAGE: <br /> <br />WE RECOMMEND PAYMENT OF: <br /> <br />S:IMunicipallAramseyl3178lSPEC2007l1a3178pe <br />-54- <br /> <br />PE-2 <br /> <br />CONTRACTOR <br /> <br />$ <br /> <br />$ <br />$ <br /> <br />$ <br /> <br />81 ,668.00 <br /> <br />81,668.00 <br />4,083.40 <br /> <br />77,584.60 <br />