My WebLink
|
Help
|
About
|
Sign Out
Home
10/28/97
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1997
>
10/28/97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 12:09:57 PM
Creation date
6/24/2003 3:32:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
10/28/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FC CASE <br /> <br />AUTHORIZE LINE ITEM REALLOCATIONS IN THE 1997 ADOPTED BUDGET FOR <br />COST CENTER #452 - PARK MAINTENANCE <br /> By: Jessie Hart, Finance Officer <br /> <br />Background: <br /> <br />Each month a detail report comparing actual expenditures to the annual operating budget is <br />distributed to those individuals who have responsibility over those areas [department heads and <br />supervisors]. Through analysis of these reports we are able to identify areas where problems are <br />likely to occur - due to changing factors from when the budget was originally adopted. An <br />analysis such as this occurred in May of this year with the Park Maintenance budget. There were <br />several areas identified where actual expenditures and commitments already exceeded the <br />adopted budget and others where it looked as though the actual may be substantially less than the <br />budgeted amounts. <br /> <br />Several conversations and written memos were shared with the Parks/Utilities Supervisor and the <br />City Engineer requesting recommendations on how we might resolve this issue. Due to no <br />response to the situation, former City Administrator Ryan Schroeder issued a memorandum <br />stating that the request to purchase the 1-ton in the parks budget would not be placed on the <br />Council agenda until the situation is resolved. <br /> <br />An additional opportunity was given to resolve this issue when each department head and <br />supervisor was requested to provide projections as to the anticipated status of each cost center <br />and department for 1997. These responses were due back to me by October 15, 1997, in <br />anticipation of presenting a 1997 budget amendment case at this meeting. Because of lack of <br />time constraints, the Finance Department has not been able to address the entire budget at this <br />time, although it is necessary that we address at least the Park Maintenance cost center at this <br />time. <br /> <br />The next case on your agenda is to approve the purchase of the 1-ton truck included in the 1997 <br />budget. This is being placed on this agenda in response to the vendor notification that the last <br />day orders will be accepted for the 1-ton chassis is October 29, 1997. We have also been <br />informed that the 1-ton chassis will not be manufactured in the 1998 model, thus creating the <br />need to order now if so authorized. <br /> <br />In order to facilitate the reconciliation of the budgetary issues I have attached a report showing <br />the status of each line item within the Parks Maintenance budget. As you can see there are <br />several line items that are over budget and others that are under. Based on recommendations <br />from the Parks/Utilities Supervisor, the following line item reallocations could be made in order <br />to keep the budget in line without increasing the total amount originally budgeted for the cost <br />center. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.