Laserfiche WebLink
<br />CASE # I <br /> <br />DISCUSS 167THA VENUE ALIGNMENT AND SCHEDULE <br />By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />Since 2004 the Capital Improvement Plan has included as a future improvement to the street <br />system the extension of 16ih Avenue between Nowthen and Armstrong Boulevards as a <br />collector street. Attached to this case is the project sheet from the current CIP which anticipates <br />this project to occur in three phases and being scheduled for constmction from east to west in <br />successive years beginning in 2007. The work has not been initiated this year as proposed in the <br />, schedule, however, there has been inquiries from the general public relative to this project and its <br />schedule. The purpose of this case is to identify the process and schedule for proceeding with <br />this project. <br /> <br />It may be useful to recall the rational for establishing the collector street system. Their purpose is <br />not intended to facilitate regional trips, but rather provide connections that feed from residential <br />streets. The City plan aims to have such collector streets spaced at approximate one mile <br />distances. The existing east/west corridors available in this area ofthe City at present time <br />include CR 63 which is located one mile to the north and Alpine Drive which is one to one and a <br />half miles to the south. As the City develops to the population projected in our comprehensive <br />plan the need for these collector roads become more evident. If they are not provided it is likely <br />that the traffic will elect to utilize existing residential streets, which are not constmcted with r <br />amenities such as sidewalks, wide shoulders and gentler curves to increase the safety of these <br />streets. <br /> <br />Staffis curreritly updating the existing CIP and it is felt the the eastern segment of this project <br />has a high priority as it will handle traffic from the developing Brookfield subdivision. A portion <br />'ofthe right of way has been donated by Oakwood Land Development Company. Additional right. <br />of way will be necessary for this east segment. Attached is an exhibit showing the horizontal <br />alignment proposed between Gamet and Quartz Streets. <br /> <br />Below is a listing of major project milestones associated with each segment of this project. Staff <br />wishes to solicit input from the Committee on appropriate target dates for any of these elements' <br />for each segment. Input is also desired relative to any additional process steps that the Committee <br />deems warranted. <br />. Determine horizontal alignment <br />. . Hold informational meeting / gather public input <br />. Finalize horizontal alignment <br />. Prepare construction plans <br />. Acquire necessary right of way <br />. Construct proj ect <br /> <br />Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed By: <br />Public Works Director/Principal City Engineer <br /> <br />PW: 09/18/07 <br /> <br />1 <br />