My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/25/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 09/25/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:33:47 PM
Creation date
9/20/2007 2:36:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/25/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sid Schedule "A" . (Continuedl <br /> <br />PAY ESTIMATE #2 <br />Ci1:}c of Ramsey <br />Ramsey Town Center <br />Phase 2, Segment 2, Utility and Street Improvements <br /> <br />CONTRACTOR <br /> <br />ITEM ESTIMATED CONTRACT UNIT USED TO <br />NO. ITEM DESCRIPTION QUANTITY UNIT PRice CONTRACT AMOUNT DATE EXTENSION <br />28 HYDRANT 2 EACH 52.250.00 $ 4,500.00 2 $ 4 500.00 <br />29 6" GATE VALVE AND BOX 2 EACH 5850.00 5 1.700.00 2 $ 1 700.00 <br />30 8" GATE VALVE AND SOX 2 EACH 51.150.00 $ 2.300.00 3 5 3 450.00 <br />31 ADJUST GATE VALVE AND BOX 7 EACH $150.00 $ 1.050.00 $ .. <br />32 HYDRANT EXTENSION 1 LF $325.00 $ 325.00 2 $ 650.00 <br />33 6" DIP CLASS 53 16 LF 520.00 5 320.00 16 $ 320.00 <br />34 12" DIP CLASS 52 1000 LF $33.00 5 33000.00 960 $ 31 680.00 <br />35 8" DIP CLASS 52 80 LF S24.00 5 1.920.00 120 $ 2 880.00 <br />36 6" POLYSTYRENE INSULATION 20 SY S32.00 $ 640,00 10 $ 320.00 <br />37 DUCTILE IRON FITTINGS 1050 LB $1.75 $ 1.837.50 700 $ 1 225.00 <br />38 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 . 4020 6 LF 5210.00 $ 1 260.00 6 $ 1 260.00 <br />39 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 . 4020 6 LF $375.00 $ 2.250.00 6 $ 2 250.00 <br /> 48" DIA. SAN. MH (0'.. 8' DEPTH) INCL. FRAME AND <br />40 CASTING 1 EACH 51.650.00 5 1 650.00 1 $ 1 650.00 <br />41 CASTING ASSEMBLIES SPECIAL 6 EACH 5420.00 5 2.520.00 6 $ 2 520.00 <br />42 CASTING ASSEMBLIES (A-7D) 1 EACH S280.00 $ 280.00 1 $ 2BO.00 <br />43 CONNECT TO EX. SAN. MH (CORE DRILl) 1 EACH 5650.00 $ 650.00 1 $ 650.00 <br /> CONSTRUCT MH OVER 12" SAN (0'.. 8' DEPTH) INCL. <br />44 F-RAME AND CASTING 1 EACH $2.000.00 $ 2000.00 1 $ 2 000.00 <br />45 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 3 EACH 5850.00 $ 2.550,00 3 $ 2 550.00 <br />46 ADJUST FRAME AND RING CASTING 16 EACH 5250.00 $ 4 000.00 7 $ 1 750.00 <br />47 EXTRA DEPTH 48" '" MH (>8') 4.2 LF 5100.00 5 420.00 4 $ 400.00 <br />48 CONCRETE CURB AND GUTTER DESIGN B618 3505 LF $8.75 5 30.668,75 3.249 5 28 428.75 <br />49 CONCRETE TRIANGULAR VALLEY GUTTER SECTIONS 10 EACH $300.00 $ 3 000.00 $ .. <br />50 CONCRETE VALLEY GUTTER 105 LF $15.00 $ 1 575.00 27B 5 4 170.00 <br />51 TRAFFIC CONTROL 1 LS 51 000.00 $ 1.000.00 0.7 $ 700.00 <br />52 TYPE III BARRICADE 5. EACH $400.00 $ 2.000.00 $ .. <br />53 SIGN PANELS TYPE C 12.5 SF 540.00 $ 500.00 $ . <br />54 PAVEMENT MESSAGE (COMBINATION ARROWlPAINT 1 EACH . 5100.00 5 100.00 $ - <br />55 PAVEMENT MESSAGE {RIGHT ARROIM EPOXY 1. EACH $100.00 $ 100 00 5 .. <br />56 PAVEMENT MESSAGE {LEFT ARROIM EPOXY 1 EACH 5100.00 5 100.00 $ . <br />57 PAVEMENT MESSAGE {ONL Yl EPOXY 3 EACH $175.00 5 525,00 $ - <br />58 F & I SIGN PANEL TYPE "D" 1 EACH 5400.00 5 400.00 $ . <br />59 4" BROKEN LINE YELLOW EPOXY 1495 LF 50.12 $ 179.40 $ .. <br />60 4" SOLID L1NE'WHITE . EPOXY 2470 LF $0.42 $ 1.037.40 $ . <br />61 24" STOP LINE WHITE. EPOXY 64 LF S8.00 $ 512.00 $ . <br />62 36" SOLID LINE WHITE.. EPOXY 102 . LF $8.00 $ 816.00 $ . <br />63 4" DOUBLE SOLID LINE YELLOW - EPOXY 190 LF $1.00 $ . 190.00 $ " <br />64 24" SOLID LINE YELLOW - PAINT 20 LF $6.00 $ 120.00 $ .. <br />65 SILT FENCE TYPEMACHINE SLICED 3970 LF $1.90 $ 7.543.00 5 .. <br />66 TEMPORARY CONSTRUCTION ROCK ENTRANCE 2 EACH S250.00 $ 500.00 $ .. <br />67 SEEDING 1.8 ACRE 5250.00 $ 450.00 $ .' .. <br />68 SEED MIXTURE 260 180 LB $2.50 5 450.00 $ . <br />69 MULCH MATERIAL TYPE 3 3 TON 5175.00 5 525.00 $ . <br />70 EROSION CONTROL BLANKETS CATEGORY 3 40 SY S6.00 5 240.00 $ - <br />71 COMMERCIAL FERTILIZER ANALYSIS 24-0-24 720 LB $0.70 $ 504.00 $ .. <br /> , <br /> <br />Total Sid Schedule "AN <br /> <br />$ <br /> <br />323.518.55 <br /> <br />$ <br /> <br />250,427.29 <br /> <br />Total Work Completed to Date $ 250,427.29 <br />LESS 5% RETAINAGE: $ 12,521.36 <br />LESS PAY ESTIMATE #1 $ n,584.60 <br />WE RECOMMEND PAYMENT OF: $ 160,321.33 <br /> <br />- 9 0 ~:\MUniCiPal\A~mSeY\3178\SPEC2007\ra3178pe <br /> <br />PE-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.