My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 10/11/2007
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2007
>
Agenda - Parks and Recreation Commission - 10/11/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:40:23 PM
Creation date
10/9/2007 10:58:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
10/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-? Elliot Skate Park <br /> <br />1 ~ 3'-0" high Pyramid (CR3-3ft), delete 5'-0" long grind rail (R202) <br />1 - 4'.0" high by 7'.6" wide bank (BK4) <br />2 - 3'-0" high x 7'~ wide x 7'-6"'-0" lOng Quarter Pipe (QP3), <br />1 - 1'-0" high x 4'-0" wide x 8'-0" long Grind Box (BX01) <br />1 - 2" square rail x 1'.0" high x 15'.0" long Square Rail (RA01S) <br />1 - 2" diameter rail x 1'-0" high x 15'-10"'ong Round Rail (R122) (to be placed in combination with CR3 Pyramid) <br />1 - Rules Sign <br /> <br />Meetings with Skaters <br /> <br />A meeting with the resident skaters will also be required to review the proposed layout plan. A second meeting may be <br />required if the proposed layout plan changes drastically due to skater revisions. <br /> <br />Required Documentation <br /> <br />· Contractor/Supplier to provide a Certificate of Liability Insurance (Accord 25-S) <br />(a copy of this certificate included at the end of this document) <br /> <br />· Contractor /Supplier to' provide a Prevailing Wage Certificate <br />(a copy of this certificate included at the end afthis document) <br /> <br />· Cantractar/Supplier to' provide the SUBP goals requirements <br />(a copy of requirements included at the end of this document) <br /> <br />Quotes <br /> <br />Submit a quote fOr all three skate parks (Armatage, Creekview and Elliot) skate park equipment base an the abave criteria <br />includina all Shipping and installation. <br /> <br />Completion: <br /> <br />Armatage, Creekvlew & Elliot skate park equipment described above should be installed no later' than October 1, 2004. <br /> <br />Purchase Order <br /> <br />The City of Minneapolis Finance Department will advertise for bid propasals for seveh (7) working days. A purchase arder will <br />be issued by the City of Minneapolis once the Minneapolis Park Board reviews all bid proposals and accepts a praposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.