My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 10/23/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:54:02 PM
Creation date
10/22/2007 7:34:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNP Storage: Site Plan Review <br />July 26, 2007 <br />Revised: October 4, 2007 <br />Page 4 of 4 <br />• Grading will be required on two of the adjacent lots in the Regency Pond neighborhood. <br />Although there are drainage and utility easements on these areas, contact should be made with <br />these property owners prior to construction. <br />• An emergency overflow elevation and location should be added to the plan <br />• The plan will need to be reviewed and permitted by the Lower Rum River Water Management <br />Organization. <br />Access: The site is located on Ramsey Blvd and Bunker Lake Blvd. The plan submittal shows. one <br />access on Ramsey Blvd and one access on Bunker Lake Blvd. Since direct access to public roadway <br />will be eliminated by dedication to Anoka County over Lots 2 and 3, it will be necessary to record an <br />access easement between the four lots in this subdivision. <br />Streets: Section 9.50.30 of City Code requires a cul -de -sac with a minimum right -of -way diameter of <br />130 feet and a minimum roadway diameter of 100 feet. The proposed turnaround area at the terminus <br />of 148 Avenue does not meet this standard. The Board of Adjustment granted a variance to this <br />requirement at their September 6, 2007 meeting. <br />Storm Water Management Fee: The 2007 Stormwater Management Fee for commercial/industrial <br />development is $4,151.00 per acre. A cash payment is required before the City can issue a building <br />permit for the storage facility site. <br />REU Number: Lot 1 is 2.8 acres in size. The Residential Equivalent Unit (REU) for the purposes of <br />quarterly billing for the storm water utility will be determined when the applicant submits information <br />on the amount of impervious area for review. <br />The City Council will be meeting at 7:00 pm on Tuesday, October 9, 2007 at the Ramsey Municipal <br />Center, 7550 Sunwood Drive to review your site plan requests. You'or your representative should be <br />present to answer any questions that may arise. Thank you for your cooperation in this process. <br />If you have any questions, please call us at (763) 427 -1410. <br />Respectfully, <br />N MSEY <br />AICP <br />nner <br />Cc: Joel Cooper <br />James R. Hill, Inc. <br />1523 94 Lane NE, Suite B <br />Blaine MN 55449 <br />Steve J wski, PF�__ <br />City Engineer <br />-131- <br />
The URL can be used to link to this page
Your browser does not support the video tag.