Laserfiche WebLink
PAY ESTIMATE #3 <br />City of Ramsey <br />Ramsey Town Center <br />Phase 2, Segment 2, Utility and Street Improvements <br />October 5, 2007 rd <br />Honorable Mayor & City Council <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />RE: Ramsey Town Center, Phase 2, Segment 2, Utility and Street Improvements <br />C tractor H d ocon Inc <br />on y r <br />Contract Amount $323,518.55 <br />Award Date: July 25, 2007 <br />Completion Date: October 15, 2007 <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above - referenced project by Hydrocon, Inca <br />Rid Schedule "A" <br />OWNER <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$6,450.00 <br />$ 6,450.00 <br />1.0 <br />$ 8 <br />2 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />35 <br />LF <br />$5.00 <br />.$ 175.00 <br />35 <br />$ 175.00 <br />3 <br />SALVAGE DIP PLUGS <br />3 <br />EACH <br />$50.00 <br />$ 150.00 <br />3 <br />$ 150.00 <br />4 <br />COMMON EXCAVATION EV <br />500 <br />CY <br />$2.00 <br />$ 1,000.00 <br />500 <br />$ 1,000.00 <br />5 <br />COMMON BORROW L <br />2400 <br />CY <br />$9.00 <br />$ 21,600.00 <br />2,359 <br />$ 21 231.00 <br />6 <br />SALVAGED TOPSOIL FROM STOCKPILE SV <br />850 <br />CY <br />$5.20 <br />$ 4,420.60 <br />1,010 <br />$ 5,252.00 <br />7 <br />SUBGRADE PREPARATION <br />18 <br />ROAD ST. <br />$135.00 <br />$ 2430.00 <br />18 <br />$ 2430.00 <br />8 <br />AGGREGATE BASE CLASS 5 MODIFIED <br />2885 <br />TON <br />$11.50 <br />$ 33,M.50 <br />2,997.541 <br />$ 34 471.71 <br />9 <br />TYPE MV3 WEARING COURSE MIXTURE <br />910 <br />TON <br />$49.50 <br />$ 45 045.00 <br />793.741 <br />$ 39 290.13 <br />10 <br />TYPE MV3 NON - WEARING COURSE MIXTURE <br />1350 <br />TON <br />$49.25 <br />$ 66 487.50 <br />1.269.S61$ <br />62 525.83 <br />11 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />390 <br />GAL <br />$2.25 <br />$ 877.50 <br />400 <br />$ 900.00 <br />12 <br />12" RC PIPE SEWER DESIGN 3006 CL5 <br />70 <br />LF <br />$25.00 <br />$ 1,750.00 <br />70 <br />$ 1,750.00 <br />13 <br />18" RC PIPE SEWER DESIGN 3006 CLS <br />50 <br />LF <br />$29.00 <br />$ 1,450.00 <br />50 <br />$ 1,450.00 <br />14 <br />27" RC PIPE SEWER DESIGN 3006 CL3 <br />50 <br />LF <br />$49.00 <br />$ 2,450.00 <br />50 <br />$ 2,450.00 <br />15 <br />33" RC PIPE SEWER DESIGN 3006 CL3 <br />30 <br />LF <br />$54.00 <br />$ 1,620.00 <br />30 <br />$ 1,620.00 <br />16 <br />CONNECT TO EXISTING STORM SEWER <br />5 <br />EACH <br />$750.00 <br />$ 3,750.00 <br />51s <br />3,750.00 <br />17 <br />12" PIPE PLUG <br />1 <br />EACH <br />$90.00 <br />$ 90.00 <br />1 <br />$ 90.00 <br />18 <br />18" PIPE PLUG <br />2 <br />EACH <br />$100.00 <br />$ 200.00 <br />21$ <br />200.00 <br />19 <br />27" PIPE PLUG <br />1 <br />EACH <br />$150.001 <br />$ 150.00 <br />1 <br />$ 150.00 <br />20 <br />8" PVC CAP <br />2 <br />EACH <br />$25.00 <br />$ 50.00 <br />1 <br />$ 25.00 <br />21 <br />8" PVC SOR-35) 8' -10' DEPTH <br />50 <br />LF <br />$14.00 <br />$ 700.00 <br />182 <br />$ 2,548.00 <br />22 <br />8" PVC SDR-35) 10'- 12' DEPTH <br />50 <br />LF <br />$15.00 <br />$ 750.00 <br />170 <br />$ 2,550.00 <br />23 <br />12' PVC SDR-35) 8'- 10' DEPTH <br />132 <br />LF <br />$19.00 <br />$ 2 508.00 <br />$ <br />24 . <br />12' PVC SDR-35) 10' -tZ DEPTH <br />120 <br />LF <br />$20.00 <br />$ 2,400.00 <br />$ <br />25 <br />TELEVISE SANITARY SEWER <br />252 <br />LF <br />$2.50 <br />$ 630.00 <br />$ <br />26 <br />CONNECT TO EXISTING WATERMAIN <br />3 <br />EACH <br />$1,000.00 <br />$ 3,000.00 <br />3 <br />$ 3,000.00 <br />27 <br />CUT IN 12"X 12"X 8" TEE <br />2 <br />EACH <br />$1 <br />$ 2,00000 <br />2 <br />$ 2,000.00 <br />S:1 Municipal \Aramsey\31781SPEC2007Tra3178pe PE-1 <br />