My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 11/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:54:34 PM
Creation date
11/9/2007 2:48:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE #~ <br />CONSIDER REQUEST FOR FENCE ALONG CSAH 5 TRAIL <br />By: Steven Jankowski, City Engineer <br />Background: <br />A bituminous wallcing trail was installed along,CSAH 5 from Sunwood Drive to 150th <br />Lane in early September. At the Septemberl8th Public Works Committee meeting Mr. <br />Ron Whaley who resides at 5650 1491h Lane stated that the presence of the trail has <br />attracted school children to cut through his yard to reach 149th Lane which is a cul de sac. <br />He wanted to know what the plans are for finishing-the walking trail near his home. He <br />-stated that there is currently about 3 feet of dirt piled up along the trail and that kids are <br />hanging around and that they might get hurt. He asked if there was a possibility of the <br />.City constructing a fence along the trail way.. Staff was directed to take a look at the <br />.situation and consider Mr. Wlzaley's suggestions. <br />The City Engineer met with Mr. Whaley on Thursday October 11th. Since the September <br />Publics Works. Committee meeting.the trail had been shouldered, however recent heavy <br />rains had eroded the side slopes and at one location along 1VIr. Whaley's property the silt. <br />fence needed to be reset. It was agreed that the Public Works Department would restore <br />and stabilize these eroded portions of the backslope as soon as possible. (This work was <br />completed on October 12, 2007). It was also agreed that the property line would be <br />located for Mr. Whaley. . <br />Observations: <br />The City of Ramsey has placed a high priority on the extension and completion of its trail <br />system. The cost of trail is below $20 per lineal foot while the cost of a six foot high <br />cedar privacy fence is approximately $25 per lineal foot. Therefore if the City were to <br />initiate a policy of constructing fences upon request of adjacent property owners there <br />could be a very substantial increase in the cost of completing the trail system. <br />Financial Impact: <br />The financial impact of constructing a fence along the trail adjacent to Mr. Whaley's <br />property is estimated to be $3,200 which would be charged to the Trail fund. However <br />more significant would be the larger impact of substantial increasing the cost and time <br />needed. to complete the citywide trail system. . <br />Recommendation: <br />Staff recommends that the Committee reaffirm the current policy of requiring fencing to <br />be placed along trails be at the discretion and cost of the property owner. <br />_171_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.