Laserfiche WebLink
the cost of inspection of the signal system. The City's share of the cost of the <br />project shall include only construction engineering expense and does not include <br />administrative expenses incurred by the County. <br />8. CONSULTANT SERVICES ~ <br />The City shall contract with a qualified consulting firm with significant experience in the design <br />of high- speed highways. The City shall not contract with a consultant until the qualifications of <br />said consultant are reviewed by and approved in writing by the appropriate staff of the Anoka <br />County Highway Department. The proposed Improvements contemplated by this Agreement on <br />T.H. 10, C.S.A.H. 83, C.R. 116, C.R. 56 and C.S.A.H./ C.R. 57 'are in fact highway <br />improvements. The design of highways is considerably different from the design of city streets <br />and the County needs to be assured that the consultant engaged by the City are experienced iri the <br />design of highways. ale thz City retains the o~~~sigh~tior;the,~d~r~~tio~~~~i~~n the ~~nsultants <br />-'~~ `~="` -~~-- ,. ' ~ . ~: ~t~ t Po~~ ers Agreement ~s secured bj~ <br />~htred for th S 4t ro~eete t ~ C.~~unt~, b~~ entenn i • ~ -, ~. ,~ r x ~, <br />y :'r ~~ )~.a Eh~ ~ Y t h ~j~, r tai ~ i.~ ~ 4/~ <br />t}».~~i t~~~a ~ a ays de 1 nzd apd ~,uiltz„~ e n~ ,~~~e~p~enC~~ ill conform to the.st inda~dsr' <br />t .,L LLY.. L4 4J7`rL~e+~ ~y~ {' ~+ n„t _ ~ ' <br />©r~ o u ,~ aX ._ `~d~)~Y~w~ ;,.r Comlh~ Roade m 4noka,Counrti~: ~~Critical factors in design <br />include but are not limited to: the cross section of the roadway, the transfer slope of the: roadways, <br />super elevation in curves, turn lane and taper lengths for lane changes and turn lane introductions, <br />curb height and type, and median and edge of road drainage. <br />The City shall provide or contract with a qualified consulting fum, with significant and proper <br />experience with respect to the construction and construction administration of county. highways. <br />Additionally, the city shall provide an adequate number of individuals to provide the amount of <br />construction inspection and administration. All inspection, control of material and associated <br />documentation for construction are to be•performed in accordance with the approved construction <br />plans, current MnDOT specifications and technical memorandums, and/or special provisions. All <br />inspectors shall be MnDOT certified as it pertains to the operations that is being inspected. <br />County concurrence must be obtained prior to the City authorizing Change Orders, Work Orders <br />and/or Supplemental Agreements that significantly increase the County's cost participation. <br />At all times, while work is actually being performed, the City, or contracted consultant, shall have <br />at the site of work a competent individual(s) who is (are): <br />Thoroughly experienced in the type of work being performed. <br />9 <br />-271- <br />