Laserfiche WebLink
Schedule C -Trunk Storm Sewer Improvements & Outfall to River <br />Item Description Extension <br />L Jack 60" Casing $78,000.00 <br />2. Jack 48" RCP $126,000.00 <br />3. 48" Carrier Pipe $13,760.00 <br />4. 42" RC Pipe Sewer Design 3006 CL III $21,600.00 <br />5. 48" RC Pipe Sewer Design 3006 CL III $13,760.00 <br />6. Jack 42" RCP $434,000.00 <br />7. 42" FES $3,200.00 <br />8. 48" FES ~ $15,200.00 <br />9: ' 42" Outlet Structure $5,000.00 <br />10. Skimmer Structure $12,000.00 <br />11. Pond Liner $254,250.00 <br />12. Sand Cushion $169,200.00 <br />13. Storm Manhole $3,000.00 <br /> Subtotal: $1,148,970.00 $0 <br />OVERHEAD & CONTINGENCY 35%: $402,139.50 -~: <br />Subtotal C -Trunk Storm Sewer Costs: $1,551,109.50 <br />MAXIMUM TOTAL COUNTY PARTICIPATION: $4,581,500 <br />-282- <br />