CASE <br /> <br />AWARD CONTRACT FOR CONSTRUCTION OF POLICE FACILITY <br /> By: Ryan R. Schroeder, City Administrator <br /> <br />Background: <br /> <br />On February 13, 1996, Council authorized receipt of bids for the Police office building. Those <br />finns that had met the pre-qualification requirements were mailed the bid materials on March 1, <br />1996. The project was also advertised in the Anoka Union. A pm-bid meeting was held on March <br />11, and the bids were due on April 2, 1996. We received four qualified bids from the original list <br />of six bidders. One bidder had withdrawn after qualifying, another informed us during this last <br />process of his intention not to bid. <br /> <br />At the February 13 meeting, Council authorized $600,000 for the hard consmaction portion of this <br />project. In addition to this, the 1996 budget has set aside $22,727 for office furnishings. This <br />allocation is expected to be sufficient for furnishing the clerical and palxol work rooms. The utility <br />extension to the municipal campus is funded out of trunk funds. <br /> <br />We had informed the bidders that it was the staff expectation that the bid award would include a <br />component for operating efficiency of the HVAC and electrical systems. Because of how the bids <br />came in, ongoing utility costs are not expected to impact the bid award (all bidders bid on the same <br />basis with operating efficiencies bid as additional options). The building is expected to have an <br />annual gas and electric bill of about $14,000. <br /> <br />Outside of the bid is any landscaping (there is required turf re-establishment) and SAC and WAC <br />fees paid by the City ($4500). <br /> <br />After comparing the four bids, staff is recommending awarding to Sharp Construction of Maple <br />Grove in an amount not to exceed $588,396. This contractor met all of the stated specifications <br />and is the lowest bidder on the project. The bids on this project (after adjustments) are as follows: <br /> <br />Kraus Anderson $664,345 <br />Bor Son $617,200 <br />Welsh $590,000 <br />Sharp $588,396 <br /> <br />It should be noted that within the bids, each <br />flooring, wall covering, and the security system. <br />to be the low bidder. <br /> <br />of the contractors have allowances for such as <br />After allowing for those issues, Sharp continues <br /> <br />Council Action <br /> <br />Motion to adopt Resolution g96-04- <br />Police Deparunent Office Building. <br /> <br />__ receiving bids and awarding contract for Construction of a <br /> <br />Reviewed by: <br /> <br />Copies also distributed to: <br /> <br />City Administrator <br /> <br />Police Chief <br />Finance Officer <br /> <br />CC: 04/09/96 <br /> <br />/jmt <br /> <br /> <br />