My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 12/03/1996 - Public Hearing @ 7:45
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
1996
>
Minutes - Planning Commission - 12/03/1996 - Public Hearing @ 7:45
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 2:47:16 PM
Creation date
7/1/2003 12:45:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Title
Public Hearing @ 7:45
Document Date
12/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEARING <br />PLANNING COMMISSION <br />CITY OF RAMSEY <br />ANOKA COUNTY <br /> STATE OF MINNESOTA <br /> <br />The Ramsey Planning Commission conducted a public hearing on Tuesday, December 3, 1996, at the <br />Ramsey Municipal Center, 15153 Nowthen Boulevard N.W., Ramsey, Minnesota to hear input <br />regarding a Request for Conditional Use Permit for Grading and Filling; Case of John Peterson <br /> <br />Members Present: <br /> <br />Chairperson David Bawden <br />Commissioner Benjamin Deemer <br />Commissioner Paul Holland <br />Commissioner Sharon Jensen <br />Commissioner Charles LaDue <br />Commissioner Michael Terry <br />Commissioner Bradley Thorud <br /> <br />Members Absent: None. <br /> <br />Also Present: <br /> <br />City Engineer Steve Jankowski <br />Zoning Administrator Sylvia Frolik <br /> <br />CALL TO ORDER <br /> <br />Chairperson Bawden called the public hearing to order at 7:45 p.m. <br /> <br />PRESENTATION <br /> <br />City Engineer, Steve Jankowski, stated that a grading and filling permit was not obtained by Mr. John <br />Peterson who is the owner of the Northeast Quarter of the Northeast Quarter of Section 9. There <br />has been an access road in existence since 1989, however in October of 1996, Mr. Peterson widened <br />and leveled the road surface by utilizing borrow material from his property. The current roadway is <br />approximately 20 to 21 feet wide and it appears that the amount of fill placed varies from a couple <br />of inches to as much as two feet. A 12-inch corrugated plastic culvert was installed in 1992, but <br />leveling of the roadway has resulted in impeded water drainage from west to east. <br /> <br />As a result of existing conditions requiting a mining and grading permit, three conditions are <br />recommended as follows: <br /> <br />The applicant be requked to re-establish natural drainage by replacing the existing 12- <br />inch culvert, with a 15-inch smooth interior culvert. The culvert shall include a flared <br />end section on the upstream side to enhance flow characteristics. The culvert shall <br /> <br />Public Hearing/Planning Commission/December 3, 1996 <br /> Page 1 of 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.