My WebLink
|
Help
|
About
|
Sign Out
Home
08/27/96
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1996
>
08/27/96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 12:13:09 PM
Creation date
7/1/2003 1:48:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
08/27/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ASE # ~ <br /> <br />LOOPING WATERMAIN IN CONJUNCTION WITH <br />T.H. #47/C.R. #116 INTERSECTION PROJECT <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the present time, the City utilities have water lines on both sides of T.H. g47, however, a <br />watermain break south of 142nd Avenue would require interrupting service to all utility customers <br />on that side of the highway. The commercial community is rapidly expanding and many of these <br />businesses are dependent on water service from the City to provide integral services associated <br />with their businesses. <br /> <br />The initial stages of the T.H. g47/C.R, gl 16 intersection project is scheduled to begin after Labor <br />Day with the installation of storm water pipes. This project provides a unique opportunity to loop <br />the watermain at C.R. gl 16 and thereby allow for the ability to back feed these areas. Normally, a <br />utility crossing of a state trunk highway would be required to be jacked under the highway, at a <br />cost ranging between $150 and $200 per foot. Installation, in conjunction with this project, will be <br />allowed to be open trenched, eliminating the jacking cost. In addition, restoration costs will be <br />eliminated. <br /> <br />The looping will require the installation of approximately 300 feet of watermain. I have prepared <br />plans and have requested a price from the contractor awarded the highway project. I anticipate <br />having a proposal for this work by the time of the Finance Committee meeting, however, the cost <br />will be well under the $25,000 threshold which would require competitive bidding. <br /> <br />Recommendation: <br /> <br />Because of substantial cost savings by looping this essential piece of watermain in conjunction <br />with the road project, I recommend authorizing the installation in the amount of <br />$ <br /> <br />Committee Action: <br /> <br />Motion to recommend City Council adopt Resolution g96-08-XXX authorizing the installation of <br />watermain along C.R. g116. (Resolution available at table) <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Finance Officer <br />Parks/Utilities Supervisor <br />City Attorney <br /> <br />FC: 08/27/96 <br /> <br />~mt <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.