My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 06/20/2000
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000
>
Minutes - Public Works Committee - 06/20/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 10:06:30 AM
Creation date
5/22/2003 11:00:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
06/20/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS COMMITTEE <br />CITY OF RAMSEY <br /> ANOKA COUNTY <br /> STATE OF MINNESOTA <br /> <br />The Ramsey Public Works Committee conducted a regular meeting on Tuesday, June 20, 2000, <br />at the Ramsey Municipal Center, 15153 Nowthen Boulevard NW, Ramsey, Minnesota. <br /> <br />Members Present: <br /> <br />Chairperson Gerald Zimmerman <br />Councilmember Margaret Connolly (alternate) <br />Councilmember Terry Hendriksen <br /> <br />Also Present: <br /> <br />Director of Public Works/Fire Chief Dean Kapler <br />City Engineer Steve Jankowski <br />City Engineer Brian Olson <br />City Administrator James Norman <br />Public Works Supervisor Grant Reimer <br /> <br />CALL TO ORDER <br /> <br />Chairperson Zimmerman called the regular meeting of the Public Works Committee to order at <br />5:25 p.m. <br /> <br />CITIZEN INPUT <br /> <br />There was none. <br /> <br />COMMITTEE BUSINESS <br /> <br />Case #l: Review of T.H. #47 Issues <br /> <br />City Engineer Jankowski stated that as the construction of the T.H. #47 project commences, there <br />are several issues, which have arisen or need to be revisited. These issues include the <br />construction of a sidewalk along Sunwood Drive, the re-creation or a berm alongside the trail <br />adjacent to the east side of T.H. #47, and discussion of the intersection at 142'~d Avenue and T.H. <br />#47. <br /> <br />1) Sidewalk along Sunwood Drive <br />City Engineer Jankowski explained that the final plans for T.H. #47 were submitted in late <br />September 1999, to ensure maximum federal funding of this project. The issue of the sidewalk <br />along the properties of Sunwood Drive from C.S.A.H. #5 to T.H. #47 was controversial with <br />arguments having been presented for the placement of the sidewalk on the north or south sides of <br />Sunwood Drive. The final plans submitted to the State showed a 1.5 meter (5 foot) concrete <br />sidewalk located 2.1 meters (7 feet) behind the south curbline of T.H. #47. Clearing for <br />Sunwood Drive has taken place and grading is continuing..If the project were'to be constructed <br />as designed, three additional trees wold need to be removed from the right-of-way off the <br /> <br />Public Works Committee/June 20, 2000 <br /> Page 1 of 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.