My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 07/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:31:29 AM
Creation date
7/7/2003 11:20:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case #5: <br /> <br />Request for Property to be Rezoned from R-1 Single Family to R-2 Medium <br />Density Residential; Case of Oak Creek Builders <br /> <br />Case #6: <br /> <br />Request for Preliminary Plat Review of Alpine Acres 2na Addition; Case of <br />Oak Creek Builders <br /> <br />Case #7: <br /> <br />Request for Site Plan Review of Alpine Acres 2nd Addition; Case of Oak <br />Creek Builders <br /> <br />Presentation <br /> <br />Associate Planner Wald advised that the subject property is approximately 42.4 acres in size and <br />the applicant is proposing to develop a total of 202 townhomes and 1 existing single-family <br />homestead for a total of 203 housing units. The property is zoned R-2 Medium Density <br />Residential with the exception of the outlot in the southwestern portion of the plat along Alpine <br />Drive, which is zoned R-1 Single Family. She stated the R-2 Zoning District allows for <br />townhome developments up to 7 units per net acre. She explained that the preliminary plat is <br />showing a net density of 6.3 units per acre. The preliminary plat is providing for a combination <br />of public and private streets through the development. The public spines that will service the <br />townhome units are Sodium Street, 153rd Lane, Radium Street and Tungsten Street. She noted <br />Staff is recommending that the proposed private street along the southwestern portion of the plat <br />serve the development as a public street. She stated Staff met with the developer' and he is <br />agreeable to dedicating the road as a public street and the preliminary plat has been revised <br />accordingly. <br /> <br />Associate Planner Wald further advised that a traffic generation analysis was performed and <br />states that above acceptable levels of service will be maintained with the build-out of Alpine <br />Acres subdivision. She noted the development is subject to density transitioning since it is <br />located adjacent to four existing single-family homes along the southwestern plat boundary line, <br />and the applicant is proposing to satisfy density transitioning through the landscape buffer option. <br />She advised City Code requires a 25-foot wide buffer area along the common boundary line, <br />which in this case is approximately 1,000 feet in length. She stated Staff has received a revised <br />landscape plan, and while they have not had time to review it in depth, it appears to meet the <br />requirements. She indicated the Tree Preservation plan submitted has not been reviewed. The <br />Park and Recreation Commission reviewed the sketch plan at their April and May meetings, and <br />are recommending park dedication requirements be satisfied through a cash payment of $330,876 <br />and land dedication of .5 acres to be utilized for public park purposes. She indicated the <br />development is providing for an 8-foot bituminous trail along Nowthen Boulevard, Alpine Drive <br />and Sunfish Lake Boulevard. The preliminary plat is also showing a 5-foot sidewalk along all <br />public streets in accordance with City Code requirements. <br /> <br />Associate Planner Wald stated the preliminary plat meets the 40% open space and 10% <br />identifiable open space requirement. She indicated City Staff recommends preliminary plat and <br />site plan approval subject to compliance with the City Staff Review Letter dated May 16, 2003. <br /> <br />Planning Commission/June 5, 2003 <br /> Page 6 of 23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.