My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 09/12/2002
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2002
>
Agenda - Parks and Recreation Commission - 09/12/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 9:54:23 AM
Creation date
7/8/2003 2:24:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
09/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sketch Plan Review: Town Center North <br />Page 3 of 4 <br /> <br />Ope_n Space: City Code requires a minimum of 40% of the development to consist of open <br />space. Open space in this case is defined as grassed lawns, landscape areas, gardens, natural <br />areas, landscape rock, mulch, wetlands, and ponding areas. City Code also requires 10% of the <br />40% required open space to be dedicated as an identifiable common area for use by. residents .of <br />the development. It appears the development is able to meet the open space requirements <br />established in City Code, though detailed calculations must be provided at preliminary plat, <br />which also needs to show the 10% common area. <br /> <br />Landscaping: A'detailed landscaping plan wiI1 be reviewed as part of the site plan review of the <br />townhomes. It should be noted that the foll0wirig plantings will be required: <br /> <br />Overstc~ry'lSecidu-gus 2 trees per dwelling unit <br />Ornamental Trees 2 trees per e.ach overstory tree <br />Skru_bs 6 trees per each overstory tree <br /> <br />Landscaping requirements will be reviewed during site plan review. <br /> <br />Screening: 'The proposed project area is located adjacent to an existing single family urban <br />development and City Code requires an additional 10% in landscaping plantings to be located <br />within the 30 foot bufferyard area located along the common boundary line. <br /> <br />Densitw Transition: Since the development abuts a large-lot R-1 Single .Family development to <br />the north, some type of density transition will be required. Methods for density transition include <br />landscape buffering or .the matching of densities around the perimeter of the development <br />property. The Planning Commission and City Council will need to have a discussion regarding <br />the appropriate density transition method. <br /> <br />Utilities: The-development will be served by municipal water and sanitary sewer. Options for <br />service are: a) developer extend sewer trunk and any costs'incurred above and beyond the sewer <br />and water trunk fees due would be the responsibility of the developer; b) the developer can wait <br />for the interceptor; c) developer can work out a lift station plan with surrounding developments <br />that ccmld be vacated when the interceptor gets to the area. The easement has to be large enough <br />to accommodate the interceptor when it gets to the area. <br /> <br />Park Dedication: The sketch Plan will be forwarded to the Park Commission for a <br />recommendat/on on park dedication. The City has the option for cash, land, or a combination of <br />land and cash. Any cash contribution ..will be at the rate in effect on the date of final plat <br />approval. The current rate is $1,700 per unit. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.