Laserfiche WebLink
Engineering <br /> <br />Development Contract Escrows: See Supplemental A - <br />Flood Zeno Search/Map: $15.00 <br /> <br />Rights-of-Way Permit Fee Structure: <br /> Annual Registration Fee <br /> Excavation Permit Fee <br /> Per Add'II Excavation (paved area) <br /> Per Add'ti Excavation (unpaved area) <br /> Trench Fee <br /> Underground Utility/Telecom Installation <br /> Directional Boring or Tunneling (in addition to <br /> excavation permit fee) <br /> <br />Underground Utility/Telecom Installation Open <br />Trenching (in addition to excavation permit fee) <br /> <br />Overhead Utility/Telecom Installation (in addition <br /> <br />$50.00 <br />$200.00 <br />$3o.oo <br />$15.00 <br /> <br />$40.00 per 100 L.F. <br /> <br />$55.00 per 100 L.F. <br />$5.00 per 100 L.F. <br /> <br />to excavation permit fee) <br /> <br />Obstruction Permit Fee <br />Permit Extension Fee <br />Mapping Fee <br />Delay Penalty (up to 3 days late) <br /> (each day late over 3 days) <br /> <br />$50.00 <br />$55.00 <br />$50.00 ($10.00ifintheCity ~rmat <br />$60:00 <br />Plus $10.00/Day <br /> <br />Individual Service Work in the Right-of-Way <br /> <br />Per Lot Fee (Can be used as an alternative for <br />new developments) <br /> <br />Connexus Energy <br />Reliant Energy <br />Qwest <br />AT&T <br /> <br />$10.O0/service <br /> <br />Urban Rural <br />$31.00/lot $35.00/1ot <br />$39.00/Iot $60.00/Iot <br />$24.00/Iot $40.00/Iot <br />$34.00/Iot $47.00/Iot <br /> <br />Special Assessment Costs (Estimated): See Supplemental A <br />Trail Fee (Bikeway/Pathway): <br />Residential $412.00 per unit . <br /> Commercial/Industrial Developeds Responsibility <br /> <br />C:\WINDOWS\TEIvlP\ORD260.DOC <br /> <br />Page 5 <br /> <br />75 <br /> <br /> <br />