Laserfiche WebLink
Engineering SupPlemental A: <br /> <br />Development Contract Escrows <br />1. Developer's Improvements <br /> Erosion Control ........................................................... , .................................................... $750.00 <br /> Tree Protection ................................................................................................................. $750.00 <br /> Street Sweeping ................................................................. ~ .......................................... $1,000.00 <br /> Iron Monuments ..................................................................................................... : .......... $50/Lot <br /> Grading, Clearing & Grubbing Certification, As-Builts ......................Value of Work Not Completed <br /> Tree Removal ......................................... : .................................................... : ................ $1,000.00 <br /> Installation of Street Lights ............................................................ Value of Work Not Completed <br /> Grading Certification & As-Builts ................................................................................... $2,500.00 <br /> <br />The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for <br />the developer's improvements. <br /> <br />The total Developer's Improvement Costs (including engineering, legal, and administrative) are <br />then multiplied by 150% to establish the Developer's Security for the proiect. <br /> <br />2. Development Contract Security Requirements ...................................... 15%of estimated project cost <br /> (public portion) based upon feasibility report <br /> <br />3. Development of FeaSibility Report $5,000.00 <br /> <br />Special Assessment Costs (estimated) <br />1. Estimated Construction Costs (costs vary according to project requirements): <br /> v' Lateral Sanitary Sewer ¢' Storm Sewer <br /> v' Trunk Sanitary Sewer ;," Streets <br /> · / Lateral Watermain ,/ Sidewalks <br /> ¢' Trunk Watermain ¢' Other <br /> All project cost estimates are identified within the project feasibility report. The construction cost <br /> estimates are based on current industry construction cost standards. The final construction costs <br /> are based on competitive bids and final construction quantities. <br /> <br />2. Estimated Project Expenses: <br /> Engineering - The estimate is based upon project size, scope and complexity. -The amount <br /> assessed is based upon billable hourly rates times project recovery rate factor. <br /> ./ Aerial Mapping - 1% of Street. The estimate is based upon 1% of the value of the street <br /> construction. The final value is based upon 1% of the final street costs. <br /> v' Administration - 3%. The estimate is based upon 3% of the estimated construction cost. <br /> The final value is based upon 3% of the final construction cost. <br /> ¢' Assessing - 1%. The estimate is based upon 1% of the estimated construction cost. The <br /> final value is based upon 1% of the final construction cost. <br /> ¢' Legal - Legal costs will be actual plus 25% <br /> ¢' Easement - Estimates are Project specific. <br /> v' Advertising - Project specific <br /> v' City Costs ' Includes inspection and all city related project costs. <br /> ¢' Street Signs - The cost is based upon the size of the project.. Includes labor, materials and <br /> 25% administrative processing fee. ' <br /> ¢' Construction Interest - Rate is determined at time of project estimate. <br /> ¢' Bonding - .5% of total project cost <br /> · / Drainage Plan - .3% of street & storm sewer costs <br /> <br />3. Seal Coating: $1.00 x sq. yd. of paved street surface <br /> <br />76 C:\WINOOWS',TEM P\ORD260.DOC Page 6 <br /> <br /> <br />