Laserfiche WebLink
Preliminary Plat Review: Centex Addition <br />July 5, 2001 <br />Page 4 of 5 <br /> <br />13. Park Dedication: The sketch plan was reviewed by the Park Commission on May 10, 2001. <br /> The Commission has recommended some land dedication to expand Bear and Woodland <br /> Green parks and provide trail connections; any remaining park dedication due will be <br /> satisfied with a cash payment. During the sketch plan review, the consensus of the Park <br /> Commission, was thru improvements to. Woodland Green and Bear Parks Should also be <br /> considered for construction as part of the plat Stage I improvements. The costs Would also <br /> be credited against any cash due for park dedication. These improvements have been <br /> identified as play equipment for Woodland Green, parking and irr/gation for Woodland <br /> Green and possibly Bear Park too. The Commission is expecting to review the preliminary <br /> plat on July 12. <br /> <br />14. Trail Development: There is a trail development fee of $50,375.00 (155 units x $325/urdt) <br /> due on the plat prior to recording the final plat. There is an 8 foot wide bituminous trail <br /> connection proposed within a 35 foot wide corridor from the easterly terminus of 155th Lane <br /> N.W., through the expanded Bear Park and terminaing at Roanoke Street. There is another 8 <br /> foot wide bituminous trail within a 35 foot wide corridor.proposed to link up with the <br /> unnamed park lot to the north. The land dedication for these'trail links is eligible for credit <br /> against the park dedication due on the plat; the construction costs for these two trail. <br /> connections are eligible for credit against the trail development fees due on the plat. <br /> <br />The Parks and Trails Plan also'calls for a b'ituminous trai.1 along the north side of Alpine <br />Drive (153rd Avenue N.W.). The Park Commission has requested that the entire segment of <br />tra/] along Alpine Drive from H,ao'. #47 to Roanoke Street be constructed as part of the Stage <br />I improvements in this plat. The land dedication within the boundaries of the plat is not <br />eligible for credit against the park dedication due on the plat.. Construction costs to install the <br />trail from the east boundary of the plat to Roanoke Street and the west boundary of the plat to <br />Hwy. #47 are eligible for credit against the trail development fees due. <br /> <br />15. T~nk Sewer and Water Fees: A trunk usage charge is required for usage of the trunk sewer <br /> and water system. The current rate is $177.3.00 per residential um1 created. A payment of <br /> $274,815.00 (155 units x $1773/unit) is due at the City prior to releasing the plat for <br /> recording. ,~ <br /> <br /> <br />