Laserfiche WebLink
SO WHAT CAN BE DONE? <br /> <br />Here are a few ideas: <br /> <br />Direct ALL traffic out onto Highway 47, entirely eliminating the need for <br />making a new road along our baclcyards and the park: (Apply for an <br />extra access permit from the MZN Dept of Transportation). <br /> <br />There is already an access onto 47 on Lord of Life's property. Utilize <br />this access by running the road from the housing South to the current <br />access. <br /> <br />Permit Lord of Life to build only ONE housing tm/t - the SouthernmOst <br />one labeled "phase 2" by the ex/sting access on Lord of Life's property. <br />That way, the road issue is solved. We f~el this is the best solution for all <br />involved. <br /> <br />DO NOT allow the trees to get cut down at the property line. Direct that <br />the plans be changed to show that, if they indeed need a road, that k be <br />run right up next to the current parking lot; not keeping space open in <br />between the current lot and the new road because they m/ght want to <br />someday add 25 or so more parking spots in between there. Our feeling <br />is that respecting and preserving the single-family residential atmosphere. <br />bordering the property is more important t. han a few parking spots! <br /> <br />Require that BOTH the trees, be kept AND a 6 to 8 foot'Pi-i'~acy fence run <br />alor~gside the eastern and northern property lines along single-farrdly <br />residential and city park property in order to provide safety for children <br />playing and privacy for our single-family neig/2borhood. <br /> <br />-¢ <br /> <br /> <br />