My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 05/08/2003
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2003
>
Agenda - Parks and Recreation Commission - 05/08/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 9:51:26 AM
Creation date
7/9/2003 7:47:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
05/08/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Items 1-8 do contain a Mit/~ation Element <br /> <br />Item 9 Mitigation element. Assuring the compatibility of development within Ramsey <br />as growth occurs is the primary goal of the comprehensive planning process. Item 27 <br />contains discussion of plan compatibility for a number of other planning documents that <br />cover land in md adjacent to the RTC site. Continued planning efforts will assure that <br />non-compatible uses do not occur as the RTC site develops. <br /> <br />As stated above, BNSF is currently worldng to address a contamination problem in the <br />southeast comer of the site. Prior to any earth-moving acti,rity in th/s area, the developer <br />must notify BNSF, lv[PCA and the City to make sure that clean-up has progressed such <br />that additional problems will not be caused. <br /> <br />Many of the nearby environmental resources shown in Figure 9.2 can actually be <br />enhanced by the development of the RTC site. There is an intent to [ink regional, County <br />and City trails &rough the site, as well as establishing a drainage corr/dor that could <br />potentially increase habitat and allow movement of wildlife between Lake Itasca and' the ' <br />Mississippi R/ver. Every at-tempt w/Il be made to incorporate habitat suitable for this to <br />OCCUlt. <br /> <br />Item 10 Mitigation Element. The only issue related to cover type to emerge duri3n, g this <br />review is the alteration of wetlands, which is discussed in the mitigation element under <br />Item 12. A complete discussion of loss of cover types with respect to fish, wildlife and <br />ecologically sensitive resources follows in Item 1 I. <br /> <br />Item 11 Mitigation Element. <br />Natural Communities: Item 12 of this report addresses wetland mitigation fully. <br />Mitigation for loss of forest/woodland can be accomplished though additional tree <br />planting within some areas of the site listed in Table 10. i as contaihing grassland <br />communities. Additional forest/woodland planting can be incorporated into planting <br />plans for the infiltration/wetland system extending south from the RTC site to the <br />Mississippi tLiver. The edges of the wetlands and infiltration areas could be established <br />as an oak savanna/woodland natural community. <br /> <br />Wildlife 7-7abitat: <br />include: <br /> <br />Several strategies are proposed to mitigate impacts to wildlife. These <br /> <br />1). Establish Greenwav Corridor Thou_~h the Site. A proposed greenway corridor is <br />shown in Figures 6.1, 12.5 and 12.6. The corridor will incorporate a system of wetland <br />treatment ponds, inSltration ponds and constructed wetlands. Areas of the corridor up to <br />the 100-year flood elevation will be planted to a mixture of native short grasses and. forbs. <br />Although this corr/dor will not extend though the site completely, it will provide an <br />oppommity for some species (those more tolerant of human presence, noise, etc.) to use <br />natural areas within the site, and to move to and from larger tracks of habitat connected to <br />the site. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.