Laserfiche WebLink
· Incorporation of"water quaIity treatment ponds" under the criteria <br /> contained in Sub-part 10(A* and B), with nature of"credit" determined by <br /> <br />*The City of Ramsey has adopted the £J?_RWMO stormwater management fllan by. <br />reference for this portion of the City, thus qualifying the City for eligibility under this <br />element. <br /> <br />As Table 12.2 shows, a total of 6.94 acres o£wetland will be'impacted and require <br />replacement. A central feature of the P,.TC is a greenway corridor running though the <br />cenu'al portion of the site. A system of storrnwater ponds, infiltration swales and <br />meandering channels will link flows entering the site fi.om the northwest with flows <br />generated on-site. TNs "waterway" will continue south from the RTC to the MTssissippi <br />River. Within the context of this waterway system, on-site wetland replacement will be <br />provided thou~ a combination o£ new wetlands, upland buglers and water quality <br />improvement ponds designed to improve functions and values to downstream wetlands. <br />The location of proposed on-site wetland replacement is shown in Figures 12.3 and 12.4. <br />Table 12...3 summarizes the acreage and type of wetland replacement for each location. A <br />general description for each wetland replacement site follows. <br /> <br />Table 12.3 Surmmary of Proposed Wetland Mitigation <br /> <br />Type 4 } . ' I" <br />(Stomwate~) . <br /> <br />(B~ers). . <br />(Restoration) <br />Subtotal . 1.'58 j2.30 ~t.35 [3~79 3'.J0 1.30 ,.0.40 11.90 [ 19.12 <br /> Grand Total { 26~37 <br /> <br />*~VC - Public Value Credits <br /> <br />Drainage Area 6 includes three existing wetlands (Wetland B, C and g). Wetland.B is a <br />created wetland that includes a narrow buffer within a conservation easement. The <br />e,'cisting drainageway will be left intact, while 0.81 acres o£the cropped wetland will be <br /> <br /> <br />