My WebLink
|
Help
|
About
|
Sign Out
Home
05/23/95
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1995
>
05/23/95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 12:15:30 PM
Creation date
7/9/2003 10:03:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
05/23/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br /> CITY HALL REMODELING <br />By: Ryan Schroeder, City Administrator <br /> <br />Background: <br /> <br />This issue impacts all Staff housed in City Hall. Those Staff have all been notified of the plans <br />to redesign and will have seen this case and concept drawings prior to the meeting. All Staff <br />was given the opportunity for input. The Police Department have received the two concept <br />plans prior to this case. <br /> <br />On May 25, 1993, the City hired the firm of Boarman, Kroos, Pfister and Associates to <br />conduct a space needs study for Public Works, Police, and Fire facilities. The study was <br />completed in July 1993. The study provided for the following projects and costs (both hard <br />and soft costs): <br /> <br />Public Works <br />Police <br />Fire <br />City Hall <br />Total facility needs ranged from: <br /> <br />$1,333,800 to $2,442,700 <br />$1,198,400 to $1,341,800 <br />$286,900 <br />$0 to $305,900 <br />$2,819,100 to $4,034,100 <br /> <br />A year later, the Minnesota Sawdust Plant at 14100 Jaspar Street N.W. became available. We <br />purchased the buildings and grounds (to house the Public Works Department) for $310,000 <br />and budgeted $280,000 for remodeling. The $590,000 cost is a significant savings over new <br />construction, but does not include shop equipment (which is part of the capital budget <br />discussion each year). <br /> <br />City Staff has been deliberating over the prospect of meeting facility needs of the other <br />departments now that Public Works appears to be taken care of. Projected in the Capital <br />Improvements Program are planning allocations of $40,000 in 1996 and 1997, with a <br />$1,100,000 proposed construction project in 1998. It is important to note, however, that there <br />is not an identified funding source for this project. <br /> <br />This spring, Ramsey hired an intern, Beth Malaby, with architectural background. Given this <br />opportunity, she was assigned to the project of providing City Hall remodeling scenarios <br />utilizing our existing building footprint. She has provided two preferred Police Department <br />remodeling schematics which are attached for your review. Metro Systems, an office supply <br />company, will be supplying schematics for modular furnishings for Community Development, <br />Administrative Services, and the Finance Departments. The same will occur for the Police <br />Department should a project go forward from this point. (At the time of this writing, the <br />furnishing concepts are not yet available, but will be included herein.) <br /> <br />The intent of the above is to provide for our facility needs (but for Public Works dealt with <br />earlier, and fire) over the next ten years. It is further intended to work within the existing <br />facility fund balance of $130,000 in order to avoid an expenditure for a new Police Department <br />or City Hall expansion in a much greater cost. It is expected that the Fire Department will need <br />to be reviewed in the near term for either expansion of the current facility or a satellite station <br />outside of this current proposed project. All Staff persons affected by this proposal have had <br />the opportunity for input into design concepts. At this point, all Staff has not seen the finished <br />drafts. <br /> <br />Police Deoartment <br /> <br />One of two concepts are suggested to allow for expansion of the Police Department. The <br />concept preferred by the department is to expand their existing space utilizing the Council <br />Chambers. The result is shown as Exhibit "A", which would result in moving the Council <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.