Laserfiche WebLink
street and utility improvement terminate just beyond the radius points of the intersection. <br />Additionally, staff feels it would be beneficial to extend street and utility improvements <br />eastward for a distance to allow the parcel east of the EDM Inc. lot to be readily marketable. <br />We recommend that the street extension be designed and constructed for a minimum of <br />1,000 feet. In our discussion with EDM Inc., we have agreed to a goal of having the <br />McKinley Street extension in place by July 1, 1996. This extension would have an <br />approximate total project cost, including construction and project overhead, of <br />approximately $100,000. <br /> <br />In selecting a consultant for this work, I would recommend that we obtain proposals from <br />several consultants and award on the basis of price and experience. I would propose the <br />City send RFP's to: <br /> <br />1. Hakanson Anderson This is a locally based £mn from Anoka which did the <br /> engineering on Business Park 95 of which this project will be an extension. <br /> <br />2. John Oliver Inc. - This is a locally based f'm'n from Elk River having a background in <br /> general civil work such as this project. <br /> <br />3. MSA Inc. - this f'u-'rn has expressed interest in performing work in Ramsey and is <br /> currently performing work in neighboring Elk River. <br /> <br />Recommendation: <br /> <br />I would recommend the following regarding the selection of consultants for the above 1996 <br />construction projects: <br /> <br />Wetland #114P Mitigation for filling associated with Sunwood Drive - Negotiate a <br />change of scope contract with John Oliver & Associates Inc. <br /> <br />Extension of Sunwood Drive from C.R. #56 to C.R. #116 and sanitary sewer and <br />watermain extension to AEC Energy Park - Accept Hakanson Anderson proposal in <br />the not-to-exceed amount of $24,800 for basic engineering services and <br />construction, staking and inspection on an hourly basis estimated at $28,500. <br /> <br />Well No. 3 - Solicit proposal for not-to-exceed costs from the following <br />engineering consultants: (1) Bonestroo, Rosene, Anderlik and Associates (2) <br />Progressive Consulting Engineers Inc. (3) Hakanson Anderson Inc. (4) John <br />Oliver Inc.; and (5) OSM Inc. <br /> <br />McKinley Street and Utility Extension - Solicit proposals for not-to-exceed costs <br />from the following engineering consultants: (1) Hakanson Anderson (2) John <br />Oliver Inc.; and (3) MSA Inc. <br /> <br />Commission Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br />City Engineer <br />City Administrator <br />Finance Officer <br />R&B: 12/12/95 <br /> <br />~mt <br /> <br /> <br />