My WebLink
|
Help
|
About
|
Sign Out
Home
10/24/95
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1995
>
10/24/95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:03:31 AM
Creation date
7/9/2003 11:22:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
10/24/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1996 AND FUTURE STREET MAINTENANCE PROGRAM <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />Beginning in 1981, the City has conducted an annual program to address the periodic <br />maintenance needs of its bituminous pavements. Attached is a table summarizing the <br />construction and maintenance history of the City's bituminous roadways. <br /> <br />The City's policy for addressing the periodic maintenance needs of its pavements is as <br />follows. Sealcoats are applied five years after a new pavement is constructed or overlayed, <br />and pavements are resealed at seven years. Overlays are applied whenever the pavement <br />conditions have deteriorated beyond the level deemed acceptable for sealcoating. For most <br />pavements, this level can be expected following the second sealcoating. <br /> <br />Because nearly 50 percent of the City's pavements were constructed between 1978 and <br />1982, the City has not been able to meet the periodic maintenance time table outlined above <br />and a backlog currently exists. We have programmed the next three years of the street <br />maintenance program such that the current backlog of streets which exceed the target <br />maintenance schedule will be eliminated after the 1998 program. At the meeting, we will <br />present exhibits for the 1996, 1997 and 1998 programs along with the backlog of projects <br />after each of these years. <br /> <br />Attached also is a projection of program costs beyond the 1998 program. The costs for <br />these later project years have not accounted for any developer escrows or other funding <br />sources such as MSA funds. The numbers do, however, suggest that an increased level of <br />funding will be required to maintain the program. <br /> <br />Committee Action: <br /> <br />Motion to recommend that Council direct the feasibility report for the 1996 Street <br />Maintenance Program. <br /> <br />Reviewed by: <br /> <br />Copies also distributed to: <br /> <br />City Engineer <br /> <br />City Administrator <br />Finance Officer <br />Public Works Supervisor <br /> <br />R&B: <br /> <br />10/24/95 <br /> <br />/jmt <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.