Laserfiche WebLink
CASE # <br /> <br />STATUS REPORT ON SUNWOOD DRIVE PROJECT <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />This case is intended to provide the Road and Bridge Committee with an update on the <br />status of the design and construction of Sunwood Drive from Wood Pond Hills to County <br />Road #57. The design of the bridge spanning Wetland #114P is underway and should be <br />completed within the next two to three weeks. City Staff has been in contact with Tom and <br />Patty Kurak, the property owners, through whose land approximately 1800 feet of the <br />roadway will traverse. A meeting with the Kurak's on July 27, 1995, resulted in a shift of <br />the roadway approximately 100 feet north at the center of their property. Subsequent to <br />that meeting, the Kurak's have requested another alternate alignment. I will have <br />illustrations of the existing and two alternative alignments available at the meting. We feel <br />it is necessary to finalize the alignment through the Kurak's property at this time as it will <br />have an impact on the final property which this roadway will need to traverse, the Ben <br />Deemer property. We hope to be able to meet with Mr. Deemer during the latter part of the <br />week of August 6, or the week of August 13. <br /> <br />Our current schedule anticipates taking bids on the project at the end of September. <br /> <br />Committee Action: <br /> <br />Motion to recommend the City Council select the road alignment through the Kurak <br />property. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br /> <br />R&B: 08/08/95 <br /> <br />/jmt <br /> <br /> <br />