Laserfiche WebLink
01. SITEWORK <br /> <br />FOX <br /> <br />PARK BUDGET: <br /> <br />No Playground <br /> <br />Grading and re-seeding with turf grass. <br /> <br />Landscaping <br /> Tree relocation <br /> Shade trees, planted. <br /> Other ornamentals, planted. <br /> Prairie restoration <br /> <br />(6 @ $65) 390 <br />(12 @ $150) 1,800 <br />(20 @ $50) 1,000 <br />(1.25 ac @ $2900/ac) 3,659 <br /> <br />8' Bituminous path <br /> <br />(1220' @ $6/l.f.) <br /> <br />Boardwalk <br />Boardwalk spur <br /> <br />(See bid comparison.) <br />(80'@ $55.70, 20'@ $87.46) <br /> <br />02. EQUIPMENT <br /> <br />01. Subtotal <br /> <br />Benches <br /> <br />Tables <br /> <br />Trash cans <br /> <br />Signage <br /> <br />(10 @ $200) <br /> <br />(3 @ $250) <br /> <br />(3 @ $100) <br /> <br />Entry sign and planter <br />Advisory and Educational signage <br /> <br />Wildlife habitat <br /> <br />(Donated.) <br /> <br />Bike rack <br /> <br />(Relocate existing.) <br /> <br />02. Subtotal <br /> <br />03. SPORTS FACILITIES <br /> <br />Tennis Court <br /> Assumes grading included. <br /> <br />03. Subtotal <br /> <br />2,000 <br />6,849 <br /> <br /> 7,320 <br /> <br />20,801 <br />6,205 <br /> <br />43,175 <br /> <br />2,000 <br /> 750 <br /> <br /> 300 <br />1000 <br /> <br /> -0- <br />4,050 <br /> <br />15,000 <br /> <br />CONSTRUCTION SUBTOTAL <br /> <br />5% CONTINGENCY <br /> <br />TOTAL <br /> <br />62,225 <br /> <br /> 3,275 <br />65,500 <br /> <br /> <br />