Laserfiche WebLink
FOX PARK BUDGET: Phased Playground <br /> <br />01. SITEWORK <br /> <br />Grading and re-seeding with turf grass. <br /> Assumes most labor by City. <br /> <br />Landscaping <br /> Tree relocation <br /> Shade trees, planted. <br /> Other ornamentals, planted. <br /> Prairie restoration <br /> <br />(6 @ $65) <br />(7 @ $150) <br />(20 @ $50) <br />(.4 ac @ $2900/ac) <br /> <br />8' Bituminous path <br /> <br />(1220' @ $6/1.f.) <br /> <br />Wetlands Boardwalk (See bid comparison) <br /> Assumes installation by City. <br /> <br /> 390 <br />1,050 <br />1,000 <br />1,160 <br /> <br />01. Subtotal <br /> <br />02. EQUIPMENT <br /> <br />Benches <br /> <br />Tables <br /> <br />Trash cans <br /> <br />Signage <br /> <br />(10 @ $200) <br /> <br />(3 @ $250) <br /> <br />(3 @ $100) <br /> <br />Entry sign and planter <br />Advisory and Educational signage <br /> <br />Play Equipment <br /> <br />Wildlife habitat <br /> <br />Bike rack <br /> <br />(Donated.) <br /> <br />(Relocate existing.) <br /> <br />02. Submtal <br /> <br />03. SPORTS FACILITIES <br /> <br />Tennis Court <br /> Assumes grading included. <br /> <br />03. Subtotal <br /> <br />50O <br /> <br />3,600 <br /> <br /> 7,320 <br />18,552 <br />29,972 <br /> <br />2,000 <br /> 750 <br /> <br /> 300 <br />1000 <br /> <br />13,203 <br /> <br /> -0- <br /> <br /> -0- <br /> <br />17,253 <br /> <br />15,000 <br /> <br />CONSTRUCTIONSUBTOTAL <br /> <br />5% CONTINGENCY <br /> <br />TOTAL <br /> <br />62,225 <br /> <br /> 3,275 <br />65,500 <br /> <br /> <br />