My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Planning Commission - 04/21/1994 - Special Meeting
Ramsey
>
Public
>
Minutes
>
Planning Commission
>
1994
>
Minutes - Planning Commission - 04/21/1994 - Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 3:02:09 PM
Creation date
7/15/2003 10:27:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Planning Commission
Document Title
Special Meeting
Document Date
04/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAB INTERCEPTOR STUDY COFI~ITTEE REPORT, <br />1976 <br /> <br />The CAB interceptor study committee analyzed the possible <br />extension of metropolitan interceptor service to the Cities of <br />Anoka, Brooklyn Park, Champlin, and Ramsey. The committee <br />consisted of representatives from these cities and <br />representatives from the Metropolitan Waste Control Commission <br />and the Metropolitan Council. <br /> <br />The CAB interceptor is a sanitary sewer facility provided by the <br />Metropolitan Waste Control Commission (MWCC). When this facility <br />was eventually built it opened the northwest part of the <br />metropolitan area to urban-density development by relieving the <br />capacity constraint at the Anoka Wastewater Treatment Plant. <br /> <br />The CAB interceptor study had a significant impact on the future <br />land use development decisions and patterns in the city of <br />Ramsey. The City of Ramsey would not have developed urban- <br />density residential and commercial land uses without this <br />sanitary sewer facility. As part of this study, the City also <br />started to consider the necessary policies and implementing tools <br />that would be needed to manage urban-density development. <br /> <br />Identified Issues <br /> <br />The southerly part of Ramsey was within the Metropolitan <br />Urban Service Area (MUSA) and was included within the area <br />of planned urbanization. The City of Ramsey was encouraged <br />to provide sufficient services and facilities to accommodate <br />its share of the total metropolitan growth and to guide that <br />growth into desirable areas in a staged manner. The study <br />committee expressly stated that "no-growth policies are not <br />desirable in this prime growth area except to protect <br />critical environmental areas." <br /> <br />An interceptor system will be needed to phase out the Anoka <br />Wastewater Treatment Facility and provide sewer service to <br />those communities within the 1990 Urban Service boundary. <br />(See figure 1). <br /> <br />Working Paper #1 <br />City of Ramsey Comprehensive <br />Land Use Element <br /> <br />Plan Update <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.