My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/22/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 07/22/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:51:53 PM
Creation date
7/18/2003 3:48:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/22/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
581
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal Information The site plan/building design application shall show <br />provisions for the' ~ollowing improvements which shall be constructed in <br />accordance with the relevant criteria prescribed herein: <br /> <br />Landscape plan, including any buffer areas, screening, existing trees to <br />be preserved and new plantings; <br /> <br />Location and si~e of any on-site septic system(s), plus area for two <br />additional systems; <br /> <br />3. Site access; <br /> <br />4. Loading docks; <br /> <br />Exterior lighting locations, specifications and diagrams of lighting <br />fixtures for the building, parking areas and site in general; <br /> <br />6. Bituminous or csncrete surfaces and curbing; <br /> <br />7. Exterior Building elevations; <br /> <br />8. Waste storage area location, and construction materials; <br /> <br />9. Site drainage; <br /> <br />10. A topographical map and grading plan; <br /> <br />11. Off-stre~t parking and outside storage or display areas; <br /> <br />11. Calculations of projected .water usage using Minnesota Pollution <br /> Control Agency and/or Minnesota Department of Health guidelines; <br /> and <br />12. Color rendering(s) and when requested by the City, colored material <br /> samples. <br /> <br />13. Traffic Generation Analysis as determined necessary by the City. <br /> <br /> Subd. 3. Zoning Administrator Review. The applicant shall submit the <br />application materials for the proposed project to the Zoning Administrator at least thirty (30) <br />days prior to a regular Planning 'Commission meeting. The application materials shall consist of <br />the following: <br /> <br />Completed site plan application; and <br />Application fee and escrow deposit, in an amount as determined from time <br />to time by City Council resolution; and <br />Information as required by 9.03.06, subd. 1; and <br />Any other information determined necessary by the City. <br /> <br />-148- 34 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.